Power assets and projects · USA · eia860m

Kearsarge Granby / KSG1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-2fb9b7a30b988679a4929c8b
Net Summer Capacity (MW)0.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-2fb9b7a30b988679a4929c8b
Net Winter Capacity (MW)0.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-2fb9b7a30b988679a4929c8b
DC Net Capacity (MW)0.6 MWdcOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-2fb9b7a30b988679a4929c8b
Detailed source fields
Original source fieldPublished value or condition
Entity ID61426
Entity NameKearsarge Granby LLC
Plant ID61815
Plant NameKearsarge Granby
Google MapMap
Bing MapMap
Plant StateMA
CountyHampshire
Balancing Authority CodeISNE
SectorIPP Non-CHP
Generator IDKSG1
Nameplate Capacity (MW)0.5
Net Summer Capacity (MW)0.5
Net Winter Capacity (MW)0.5
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month3
Operating Year2017
Status(OP) Operating
DC Net Capacity (MW)0.6
Latitude42.222962
Longitude-72.50833
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:20056

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:20052

Sources EV-41060dfeae44fe26a13275cf
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8c12301e50d3e6757d43a32a9d282ccb36dba9d480f5546394fcc4357bf101b0

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:20056

Sources EV-2fb9b7a30b988679a4929c8b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7960bcf79b95e5cdef2efa19c8af2a4029c6fdd25035fb8c8a718e7fbe98d0bb

Usage terms US government public domain

Source snapshots by date · USA · eia860

Kearsarge Granby / KSG1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID61426
Utility NameKearsarge Granby LLC
Plant Code61815
Plant NameKearsarge Granby
StateMA
CountyHampshire
Generator IDKSG1
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.5
Summer Capacity (MW)0.5
Winter Capacity (MW)0.5
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month3
Operating Year2017
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1SUN
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:20052

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:20052

Sources EV-41060dfeae44fe26a13275cf
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8c12301e50d3e6757d43a32a9d282ccb36dba9d480f5546394fcc4357bf101b0

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Kearsarge Granby / KSG1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID61426
Entity NameKearsarge Granby LLC
Plant ID61815
Plant NameKearsarge Granby
Google MapMap
Bing MapMap
Plant StateMA
CountyHampshire
Balancing Authority CodeISNE
SectorIPP Non-CHP
Generator IDKSG1
Nameplate Capacity (MW)0.5
Net Summer Capacity (MW)0.5
Net Winter Capacity (MW)0.5
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month3
Operating Year2017
Status(OP) Operating
DC Net Capacity (MW)0.6
Latitude42.222962
Longitude-72.50833
Original text(OP) Operating
source_record_idOperating:20056

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:20056

Sources EV-2fb9b7a30b988679a4929c8b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7960bcf79b95e5cdef2efa19c8af2a4029c6fdd25035fb8c8a718e7fbe98d0bb

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel