POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Leo Community Solar / LEO

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a082bf60ca23d137e2b64415
Net Summer Capacity (MW)1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a082bf60ca23d137e2b64415
Net Winter Capacity (MW)1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a082bf60ca23d137e2b64415
DC Net Capacity (MW)1.5 MWdcOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a082bf60ca23d137e2b64415
Detailed source fields
Original source fieldPublished value or condition
Entity ID62759
Entity NameGeronimo Power
Plant ID61713
Plant NameLeo Community Solar
Google MapMap
Bing MapMap
Plant StateMN
CountyMurray
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDLEO
Nameplate Capacity (MW)1
Net Summer Capacity (MW)1
Net Winter Capacity (MW)1
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month12
Operating Year2018
Status(OP) Operating
DC Net Capacity (MW)1.5
Latitude43.978197
Longitude-95.85078
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:19947

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:19943

Sources EV-ef2e7a5e9f5c812990342942
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cbc45da17db2a3fa8b9eb30d80b53c6db7504b4e46e8b59ffa15803b5a49c4c4

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:19947

Sources EV-a082bf60ca23d137e2b64415
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 af152675854ebf1959fc36a26eeb4ef00f516dd9076c4e3694f2bd34ca264f0d

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Leo Community Solar / LEO

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID62759
Entity NameGeronimo Power
Plant ID61713
Plant NameLeo Community Solar
Google MapMap
Bing MapMap
Plant StateMN
CountyMurray
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDLEO
Nameplate Capacity (MW)1
Net Summer Capacity (MW)1
Net Winter Capacity (MW)1
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month12
Operating Year2018
Status(OP) Operating
DC Net Capacity (MW)1.5
Latitude43.978197
Longitude-95.85078
Original text(OP) Operating
source_record_idOperating:19947

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:19947

Sources EV-a082bf60ca23d137e2b64415
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 af152675854ebf1959fc36a26eeb4ef00f516dd9076c4e3694f2bd34ca264f0d

Usage terms US government public domain

Source snapshots by date · USA · eia860

Leo Community Solar / LEO

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID62759
Utility NameGeronimo Power
Plant Code61713
Plant NameLeo Community Solar
StateMN
CountyMurray
Generator IDLEO
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)1
Summer Capacity (MW)1
Winter Capacity (MW)1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month12
Operating Year2018
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1SUN
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:19943

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:19943

Sources EV-ef2e7a5e9f5c812990342942
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cbc45da17db2a3fa8b9eb30d80b53c6db7504b4e46e8b59ffa15803b5a49c4c4

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel