Power assets and projects · USA · eia860m

Hunter / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)488.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6013c49598fb8082cc8d9ac1
Net Summer Capacity (MW)446 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6013c49598fb8082cc8d9ac1
Net Winter Capacity (MW)446 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6013c49598fb8082cc8d9ac1
Detailed source fields
Original source fieldPublished value or condition
Entity ID14354
Entity NamePacifiCorp
Plant ID6165
Plant NameHunter
Google MapMap
Bing MapMap
Plant StateUT
CountyEmery
Balancing Authority CodePACE
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)488.3
Net Summer Capacity (MW)446
Net Winter Capacity (MW)446
TechnologyConventional Steam Coal
Energy Source CodeBIT
Prime Mover CodeST
Operating Month6
Operating Year1980
Status(OP) Operating
Latitude39.1747
Longitude-111.0289
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6193

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6187

Sources EV-b34a0459d721b23154bc615d
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b3ef578627d15a6968120c638efd678842a10543d9d02f10dd9a9b7d632fc1f5

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6193

Sources EV-6013c49598fb8082cc8d9ac1
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 9ee1233ca0a52e363e1b48c90273c12b3f7dd6249186e3db6c32f25c1870cc7c

Usage terms US government public domain

Source snapshots by date · USA · eia860

Hunter / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID14354
Utility NamePacifiCorp
Plant Code6165
Plant NameHunter
StateUT
CountyEmery
Generator ID2
TechnologyConventional Steam Coal
Prime MoverST
OwnershipJ
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)488.3
Nameplate Power Factor0.93
Summer Capacity (MW)446
Winter Capacity (MW)446
Minimum Load (MW)80
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year1980
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1BIT
Startup Source 1DFO
Solid Fuel Gasification System?N
Time from Cold Shutdown to Full LoadOVER
Pulverized Coal Technology?Y
Subcritical Technology?Y
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:6187

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6187

Sources EV-b34a0459d721b23154bc615d
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b3ef578627d15a6968120c638efd678842a10543d9d02f10dd9a9b7d632fc1f5

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Hunter / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID14354
Entity NamePacifiCorp
Plant ID6165
Plant NameHunter
Google MapMap
Bing MapMap
Plant StateUT
CountyEmery
Balancing Authority CodePACE
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)488.3
Net Summer Capacity (MW)446
Net Winter Capacity (MW)446
TechnologyConventional Steam Coal
Energy Source CodeBIT
Prime Mover CodeST
Operating Month6
Operating Year1980
Status(OP) Operating
Latitude39.1747
Longitude-111.0289
Original text(OP) Operating
source_record_idOperating:6193

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6193

Sources EV-6013c49598fb8082cc8d9ac1
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 9ee1233ca0a52e363e1b48c90273c12b3f7dd6249186e3db6c32f25c1870cc7c

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel