Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Grand Coulee / PG12 Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 53.5 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-8e8b13c8a4cb593d7336d7ba Net Summer Capacity (MW) 53.5 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-8e8b13c8a4cb593d7336d7ba Net Winter Capacity (MW) 53.5 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-8e8b13c8a4cb593d7336d7ba
Detailed source fields Original source field Published value or condition Entity ID 2518 Entity Name U S Bureau of Reclamation Plant ID 6163 Plant Name Grand Coulee Google Map Map Bing Map Map Plant State WA County Grant Balancing Authority Code BPAT Sector Electric Utility Generator ID PG12 Nameplate Capacity (MW) 53.5 Net Summer Capacity (MW) 53.5 Net Winter Capacity (MW) 53.5 Technology Hydroelectric Pumped Storage Energy Source Code WAT Prime Mover Code PS Operating Month 4 Operating Year 1984 Status (OP) Operating Latitude 47.957511 Longitude -118.9773 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:6188
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:6182
Sources EV-4ee687fe841f98480f956b58 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 31281e773ad785ae3fbe946e3556b8434e1d4ed3918196bb2b5537254ab35c02 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:6188
Sources EV-8e8b13c8a4cb593d7336d7ba Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 69d697037ce67b0f93a80c76c04df66d1475791c162086ca1c401832cd4f05d3 Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860 Grand Coulee / PG12 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 2518 Utility Name U S Bureau of Reclamation Plant Code 6163 Plant Name Grand Coulee State WA County Grant Generator ID PG12 Technology Hydroelectric Pumped Storage Prime Mover PS Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 53.5 Nameplate Power Factor 1 Summer Capacity (MW) 53.5 Winter Capacity (MW) 53.5 Minimum Load (MW) 16.1 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 4 Operating Year 1984 Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 WAT Time from Cold Shutdown to Full Load 10M Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:6182
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:6182
Sources EV-4ee687fe841f98480f956b58 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 31281e773ad785ae3fbe946e3556b8434e1d4ed3918196bb2b5537254ab35c02 Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860m Grand Coulee / PG12 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 2518 Entity Name U S Bureau of Reclamation Plant ID 6163 Plant Name Grand Coulee Google Map Map Bing Map Map Plant State WA County Grant Balancing Authority Code BPAT Sector Electric Utility Generator ID PG12 Nameplate Capacity (MW) 53.5 Net Summer Capacity (MW) 53.5 Net Winter Capacity (MW) 53.5 Technology Hydroelectric Pumped Storage Energy Source Code WAT Prime Mover Code PS Operating Month 4 Operating Year 1984 Status (OP) Operating Latitude 47.957511 Longitude -118.9773 Original text (OP) Operating source_record_id Operating:6188
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:6188
Sources EV-8e8b13c8a4cb593d7336d7ba Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 69d697037ce67b0f93a80c76c04df66d1475791c162086ca1c401832cd4f05d3 Usage terms US government public domain