POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Grand Coulee / PG12

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)53.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-8e8b13c8a4cb593d7336d7ba
Net Summer Capacity (MW)53.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-8e8b13c8a4cb593d7336d7ba
Net Winter Capacity (MW)53.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-8e8b13c8a4cb593d7336d7ba
Detailed source fields
Original source fieldPublished value or condition
Entity ID2518
Entity NameU S Bureau of Reclamation
Plant ID6163
Plant NameGrand Coulee
Google MapMap
Bing MapMap
Plant StateWA
CountyGrant
Balancing Authority CodeBPAT
SectorElectric Utility
Generator IDPG12
Nameplate Capacity (MW)53.5
Net Summer Capacity (MW)53.5
Net Winter Capacity (MW)53.5
TechnologyHydroelectric Pumped Storage
Energy Source CodeWAT
Prime Mover CodePS
Operating Month4
Operating Year1984
Status(OP) Operating
Latitude47.957511
Longitude-118.9773
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6188

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6182

Sources EV-4ee687fe841f98480f956b58
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 31281e773ad785ae3fbe946e3556b8434e1d4ed3918196bb2b5537254ab35c02

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6188

Sources EV-8e8b13c8a4cb593d7336d7ba
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 69d697037ce67b0f93a80c76c04df66d1475791c162086ca1c401832cd4f05d3

Usage terms US government public domain

Source snapshots by date · USA · eia860

Grand Coulee / PG12

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID2518
Utility NameU S Bureau of Reclamation
Plant Code6163
Plant NameGrand Coulee
StateWA
CountyGrant
Generator IDPG12
TechnologyHydroelectric Pumped Storage
Prime MoverPS
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)53.5
Nameplate Power Factor1
Summer Capacity (MW)53.5
Winter Capacity (MW)53.5
Minimum Load (MW)16.1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month4
Operating Year1984
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Time from Cold Shutdown to Full Load10M
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:6182

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6182

Sources EV-4ee687fe841f98480f956b58
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 31281e773ad785ae3fbe946e3556b8434e1d4ed3918196bb2b5537254ab35c02

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Grand Coulee / PG12

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID2518
Entity NameU S Bureau of Reclamation
Plant ID6163
Plant NameGrand Coulee
Google MapMap
Bing MapMap
Plant StateWA
CountyGrant
Balancing Authority CodeBPAT
SectorElectric Utility
Generator IDPG12
Nameplate Capacity (MW)53.5
Net Summer Capacity (MW)53.5
Net Winter Capacity (MW)53.5
TechnologyHydroelectric Pumped Storage
Energy Source CodeWAT
Prime Mover CodePS
Operating Month4
Operating Year1984
Status(OP) Operating
Latitude47.957511
Longitude-118.9773
Original text(OP) Operating
source_record_idOperating:6188

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6188

Sources EV-8e8b13c8a4cb593d7336d7ba
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 69d697037ce67b0f93a80c76c04df66d1475791c162086ca1c401832cd4f05d3

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel