Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Davis Besse / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)925.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d26eabf34489745d6dc408bf
Net Summer Capacity (MW)894 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d26eabf34489745d6dc408bf
Net Winter Capacity (MW)908 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d26eabf34489745d6dc408bf
Planned Uprate of Summer Capacity (MW)80 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d26eabf34489745d6dc408bf
Detailed source fields
Original source fieldPublished value or condition
Entity ID64225
Entity NameEnergy Harbor Nuclear Generation LLC
Plant ID6149
Plant NameDavis Besse
Google MapMap
Bing MapMap
Plant StateOH
CountyOttawa
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator ID1
Nameplate Capacity (MW)925.2
Net Summer Capacity (MW)894
Net Winter Capacity (MW)908
TechnologyNuclear
Energy Source CodeNUC
Prime Mover CodeST
Operating Month11
Operating Year1977
Status(OP) Operating
Planned Uprate Year2034
Planned Uprate Month7
Planned Uprate of Summer Capacity (MW)80
Latitude41.5967
Longitude-83.0861
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6142

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6136

Sources EV-c8695a1acef9516b4e8af501
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 db334d8d9c3ba6649b60cf0f29feab94728be768cc2ad15cae1890d1551664a2

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6142

Sources EV-d26eabf34489745d6dc408bf
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 441ac52dc2914313707bc4cc55fac90c890f01419f276751e5d343b257b81c08

Usage terms US government public domain

Source snapshots by date · USA · eia860

Davis Besse / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID64225
Utility NameEnergy Harbor Nuclear Generation LLC
Plant Code6149
Plant NameDavis Besse
StateOH
CountyOttawa
Generator ID1
TechnologyNuclear
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)925.2
Nameplate Power Factor0.9
Summer Capacity (MW)894
Winter Capacity (MW)908
Minimum Load (MW)110
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month11
Operating Year1977
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1NUC
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full LoadOVER
Planned Net Summer Capacity Uprate (MW)80
Planned Net Winter Capacity Uprate (MW)80
Planned Uprate Month7
Planned Uprate Year2034
Multiple Fuels?N
Cofire Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:6136

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6136

Sources EV-c8695a1acef9516b4e8af501
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 db334d8d9c3ba6649b60cf0f29feab94728be768cc2ad15cae1890d1551664a2

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Davis Besse / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID64225
Entity NameEnergy Harbor Nuclear Generation LLC
Plant ID6149
Plant NameDavis Besse
Google MapMap
Bing MapMap
Plant StateOH
CountyOttawa
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator ID1
Nameplate Capacity (MW)925.2
Net Summer Capacity (MW)894
Net Winter Capacity (MW)908
TechnologyNuclear
Energy Source CodeNUC
Prime Mover CodeST
Operating Month11
Operating Year1977
Status(OP) Operating
Planned Uprate Year2034
Planned Uprate Month7
Planned Uprate of Summer Capacity (MW)80
Latitude41.5967
Longitude-83.0861
Original text(OP) Operating
source_record_idOperating:6142

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6142

Sources EV-d26eabf34489745d6dc408bf
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 441ac52dc2914313707bc4cc55fac90c890f01419f276751e5d343b257b81c08

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel