POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

McIntosh / CT8

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)101.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ac06e810cbe0f5ae851f663e
Net Summer Capacity (MW)82.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ac06e810cbe0f5ae851f663e
Net Winter Capacity (MW)94.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ac06e810cbe0f5ae851f663e
Detailed source fields
Original source fieldPublished value or condition
Entity ID7140
Entity NameGeorgia Power Co
Plant ID6124
Plant NameMcIntosh
Google MapMap
Bing MapMap
Plant StateGA
CountyEffingham
Balancing Authority CodeSOCO
SectorElectric Utility
Generator IDCT8
Nameplate Capacity (MW)101.3
Net Summer Capacity (MW)82.2
Net Winter Capacity (MW)94.5
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month2
Operating Year1994
Status(OP) Operating
Latitude32.356287
Longitude-81.16835
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6081

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6075

Sources EV-498a354ecf050a468c910799
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9db8ef3f0e6f253aaa4d504000befb9ecb28efe7c3eb41a45222e12f1916d9b7

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6081

Sources EV-ac06e810cbe0f5ae851f663e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 be92a7d48dfac964efe091e88f4773331ff2a04c3be7fbf861324dfe6ebebeaa

Usage terms US government public domain

Source snapshots by date · USA · eia860

McIntosh / CT8

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID7140
Utility NameGeorgia Power Co
Plant Code6124
Plant NameMcIntosh
StateGA
CountyEffingham
Generator IDCT8
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)101.3
Nameplate Power Factor0.85
Summer Capacity (MW)82.2
Winter Capacity (MW)94.5
Minimum Load (MW)57
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month2
Operating Year1994
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Energy Source 2DFO
Solid Fuel Gasification System?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?Y
Cofire Fuels?N
Switch Between Oil and Natural Gas?Y
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:6075

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6075

Sources EV-498a354ecf050a468c910799
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9db8ef3f0e6f253aaa4d504000befb9ecb28efe7c3eb41a45222e12f1916d9b7

Usage terms US government public domain

Source snapshots by date · USA · eia860m

McIntosh / CT8

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID7140
Entity NameGeorgia Power Co
Plant ID6124
Plant NameMcIntosh
Google MapMap
Bing MapMap
Plant StateGA
CountyEffingham
Balancing Authority CodeSOCO
SectorElectric Utility
Generator IDCT8
Nameplate Capacity (MW)101.3
Net Summer Capacity (MW)82.2
Net Winter Capacity (MW)94.5
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month2
Operating Year1994
Status(OP) Operating
Latitude32.356287
Longitude-81.16835
Original text(OP) Operating
source_record_idOperating:6081

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6081

Sources EV-ac06e810cbe0f5ae851f663e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 be92a7d48dfac964efe091e88f4773331ff2a04c3be7fbf861324dfe6ebebeaa

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel