POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Battle Mountain Solar Project / BMSP

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)101 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-fcdd8142983017c6e0acd8e7
Net Summer Capacity (MW)101 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-fcdd8142983017c6e0acd8e7
Net Winter Capacity (MW)101 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-fcdd8142983017c6e0acd8e7
DC Net Capacity (MW)122.9 MWdcOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-fcdd8142983017c6e0acd8e7
Detailed source fields
Original source fieldPublished value or condition
Entity ID67192
Entity NameRWE Clean Energy
Plant ID61098
Plant NameBattle Mountain Solar Project
Google MapMap
Bing MapMap
Plant StateNV
CountyHumboldt
Balancing Authority CodeNEVP
SectorIPP Non-CHP
Generator IDBMSP
Nameplate Capacity (MW)101
Net Summer Capacity (MW)101
Net Winter Capacity (MW)101
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month5
Operating Year2021
Status(OP) Operating
DC Net Capacity (MW)122.9
Latitude40.718433
Longitude-117.0614
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:19154

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:19153

Sources EV-fa8c395a0572fb0804d01cb3
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7e0b721c47244b099daf4851ff8b1fdbc726c74661d6e7a3c1c5f03460f8772b

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:19154

Sources EV-fcdd8142983017c6e0acd8e7
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 aca9e502283879ad471c5ea394d9b64655c08a71998ab3fbbd56353230a40de7

Usage terms US government public domain

Source snapshots by date · USA · eia860

Battle Mountain Solar Project / BMSP

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID67192
Utility NameRWE Clean Energy
Plant Code61098
Plant NameBattle Mountain Solar Project
StateNV
CountyHumboldt
Generator IDBMSP
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)101
Summer Capacity (MW)101
Winter Capacity (MW)101
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month5
Operating Year2021
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1SUN
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:19153

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:19153

Sources EV-fa8c395a0572fb0804d01cb3
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7e0b721c47244b099daf4851ff8b1fdbc726c74661d6e7a3c1c5f03460f8772b

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Battle Mountain Solar Project / BMSP

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID67192
Entity NameRWE Clean Energy
Plant ID61098
Plant NameBattle Mountain Solar Project
Google MapMap
Bing MapMap
Plant StateNV
CountyHumboldt
Balancing Authority CodeNEVP
SectorIPP Non-CHP
Generator IDBMSP
Nameplate Capacity (MW)101
Net Summer Capacity (MW)101
Net Winter Capacity (MW)101
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month5
Operating Year2021
Status(OP) Operating
DC Net Capacity (MW)122.9
Latitude40.718433
Longitude-117.0614
Original text(OP) Operating
source_record_idOperating:19154

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:19154

Sources EV-fcdd8142983017c6e0acd8e7
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 aca9e502283879ad471c5ea394d9b64655c08a71998ab3fbbd56353230a40de7

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel