Power assets and projects · USA · eia860m

King Mill / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1f3998cc9ad0ccf0c8cb7380
Net Summer Capacity (MW)1.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1f3998cc9ad0ccf0c8cb7380
Net Winter Capacity (MW)1.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1f3998cc9ad0ccf0c8cb7380
Detailed source fields
Original source fieldPublished value or condition
Entity ID55810
Entity NameAugusta Canal Authority
Plant ID61000
Plant NameKing Mill
Google MapMap
Bing MapMap
Plant StateGA
CountyRichmond
Balancing Authority CodeSOCO
SectorIndustrial Non-CHP
Generator ID2
Nameplate Capacity (MW)1.5
Net Summer Capacity (MW)1.4
Net Winter Capacity (MW)1.4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1944
Status(OP) Operating
Latitude33.485245
Longitude-81.9912
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:19052

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:19051

Sources EV-e7abb32058b194b03536317c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 864366c56d22a61e344619af76459d208da2753926e3b74237601df7a1bcd05f

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:19052

Sources EV-1f3998cc9ad0ccf0c8cb7380
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4697b4c1ccb3a754869c7eeb1bf08ca35fc10713d1c2e7e797eb9ebfa67433eb

Usage terms US government public domain

Source snapshots by date · USA · eia860m

King Mill / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID55810
Entity NameAugusta Canal Authority
Plant ID61000
Plant NameKing Mill
Google MapMap
Bing MapMap
Plant StateGA
CountyRichmond
Balancing Authority CodeSOCO
SectorIndustrial Non-CHP
Generator ID2
Nameplate Capacity (MW)1.5
Net Summer Capacity (MW)1.4
Net Winter Capacity (MW)1.4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1944
Status(OP) Operating
Latitude33.485245
Longitude-81.9912
Original text(OP) Operating
source_record_idOperating:19052

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:19052

Sources EV-1f3998cc9ad0ccf0c8cb7380
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4697b4c1ccb3a754869c7eeb1bf08ca35fc10713d1c2e7e797eb9ebfa67433eb

Usage terms US government public domain

Source snapshots by date · USA · eia860

King Mill / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID55810
Utility NameAugusta Canal Authority
Plant Code61000
Plant NameKing Mill
StateGA
CountyRichmond
Generator ID2
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)1.5
Nameplate Power Factor0.99
Summer Capacity (MW)1.4
Winter Capacity (MW)1.4
Minimum Load (MW)0.3
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month1
Operating Year1944
Associated with Combined Heat and Power SystemN
Sector NameIndustrial Non-CHP
Sector6
Topping or BottomingX
Energy Source 1WAT
Time from Cold Shutdown to Full Load1H
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:19051

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:19051

Sources EV-e7abb32058b194b03536317c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 864366c56d22a61e344619af76459d208da2753926e3b74237601df7a1bcd05f

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel