Power assets and projects · USA · eia860m

Stony Brook / CT2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)85 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3d8faf8312e2c32ce8f6f17a
Net Summer Capacity (MW)69.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3d8faf8312e2c32ce8f6f17a
Net Winter Capacity (MW)87 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3d8faf8312e2c32ce8f6f17a
Detailed source fields
Original source fieldPublished value or condition
Entity ID11806
Entity NameMassachusetts Mun Wholes Electric Co
Plant ID6081
Plant NameStony Brook
Google MapMap
Bing MapMap
Plant StateMA
CountyHampden
Balancing Authority CodeISNE
SectorElectric Utility
Generator IDCT2
Unit CodeCC1
Nameplate Capacity (MW)85
Net Summer Capacity (MW)69.7
Net Winter Capacity (MW)87
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month11
Operating Year1981
Status(OP) Operating
Latitude42.1978
Longitude-72.5106
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6008

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6002

Sources EV-4427aa3ace64661cdd2f850a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 84254d169607f65a5869c2564b7ad32f68cff081ea55d442093c1b093e8ac7b8

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6008

Sources EV-3d8faf8312e2c32ce8f6f17a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 92632081f60f33a4e52ee1486ec5acbb4ae767f6e692278e9217d0e4220e42e0

Usage terms US government public domain

Source snapshots by date · USA · eia860

Stony Brook / CT2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID11806
Utility NameMassachusetts Mun Wholes Electric Co
Plant Code6081
Plant NameStony Brook
StateMA
CountyHampden
Generator IDCT2
TechnologyNatural Gas Fired Combined Cycle
Prime MoverCT
Unit CodeCC1
OwnershipJ
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?Y
RTO/ISO LMP Node DesignationUN.STONYBRK13.2ST1B
RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERC.Z.WCMASS
Nameplate Capacity (MW)85
Nameplate Power Factor0.9
Summer Capacity (MW)69.7
Winter Capacity (MW)87
Minimum Load (MW)55
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month11
Operating Year1981
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Energy Source 2DFO
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load10M
Multiple Fuels?Y
Cofire Fuels?Y
Switch Between Oil and Natural Gas?Y
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:6002

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6002

Sources EV-4427aa3ace64661cdd2f850a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 84254d169607f65a5869c2564b7ad32f68cff081ea55d442093c1b093e8ac7b8

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Stony Brook / CT2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID11806
Entity NameMassachusetts Mun Wholes Electric Co
Plant ID6081
Plant NameStony Brook
Google MapMap
Bing MapMap
Plant StateMA
CountyHampden
Balancing Authority CodeISNE
SectorElectric Utility
Generator IDCT2
Unit CodeCC1
Nameplate Capacity (MW)85
Net Summer Capacity (MW)69.7
Net Winter Capacity (MW)87
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month11
Operating Year1981
Status(OP) Operating
Latitude42.1978
Longitude-72.5106
Original text(OP) Operating
source_record_idOperating:6008

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6008

Sources EV-3d8faf8312e2c32ce8f6f17a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 92632081f60f33a4e52ee1486ec5acbb4ae767f6e692278e9217d0e4220e42e0

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel