POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Stony Brook / CA1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)105 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a122c49f96ef484f3d304e5f
Net Summer Capacity (MW)96 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a122c49f96ef484f3d304e5f
Net Winter Capacity (MW)105 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a122c49f96ef484f3d304e5f
Detailed source fields
Original source fieldPublished value or condition
Entity ID11806
Entity NameMassachusetts Mun Wholes Electric Co
Plant ID6081
Plant NameStony Brook
Google MapMap
Bing MapMap
Plant StateMA
CountyHampden
Balancing Authority CodeISNE
SectorElectric Utility
Generator IDCA1
Unit CodeCC1
Nameplate Capacity (MW)105
Net Summer Capacity (MW)96
Net Winter Capacity (MW)105
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeCA
Operating Month11
Operating Year1981
Status(OP) Operating
Latitude42.1978
Longitude-72.5106
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6006

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6000

Sources EV-1dd05e50723586b91f1e11c2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cda139eddbd50e1fb2d0a60de30ce8a3f31df258309bcdecd4af38f435341464

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6006

Sources EV-a122c49f96ef484f3d304e5f
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 fc104d90232b11be1f05735c4be48fc46a63692cf00306d60d915a549bb09736

Usage terms US government public domain

Source snapshots by date · USA · eia860

Stony Brook / CA1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID11806
Utility NameMassachusetts Mun Wholes Electric Co
Plant Code6081
Plant NameStony Brook
StateMA
CountyHampden
Generator IDCA1
TechnologyPetroleum Liquids
Prime MoverCA
Unit CodeCC1
OwnershipJ
Duct BurnersN
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)105
Nameplate Power Factor0.9
Summer Capacity (MW)96
Winter Capacity (MW)105
Minimum Load (MW)20
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month11
Operating Year1981
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1DFO
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load12H
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:6000

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6000

Sources EV-1dd05e50723586b91f1e11c2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cda139eddbd50e1fb2d0a60de30ce8a3f31df258309bcdecd4af38f435341464

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Stony Brook / CA1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID11806
Entity NameMassachusetts Mun Wholes Electric Co
Plant ID6081
Plant NameStony Brook
Google MapMap
Bing MapMap
Plant StateMA
CountyHampden
Balancing Authority CodeISNE
SectorElectric Utility
Generator IDCA1
Unit CodeCC1
Nameplate Capacity (MW)105
Net Summer Capacity (MW)96
Net Winter Capacity (MW)105
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeCA
Operating Month11
Operating Year1981
Status(OP) Operating
Latitude42.1978
Longitude-72.5106
Original text(OP) Operating
source_record_idOperating:6006

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6006

Sources EV-a122c49f96ef484f3d304e5f
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 fc104d90232b11be1f05735c4be48fc46a63692cf00306d60d915a549bb09736

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel