Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Intel Santa Clara / NTL00

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0a5b419e5ef4cbad9439ae81
Net Summer Capacity (MW)1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0a5b419e5ef4cbad9439ae81
Net Winter Capacity (MW)1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0a5b419e5ef4cbad9439ae81
Detailed source fields
Original source fieldPublished value or condition
Entity ID57128
Entity NameBloom Energy
Plant ID60224
Plant NameIntel Santa Clara
Google MapMap
Bing MapMap
Plant StateCA
CountySanta Clara
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDNTL00
Nameplate Capacity (MW)1.1
Net Summer Capacity (MW)1
Net Winter Capacity (MW)1
TechnologyOther Natural Gas
Energy Source CodeNG
Prime Mover CodeFC
Operating Month1
Operating Year2015
Status(OP) Operating
Latitude37.384745
Longitude-121.9638
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:18177

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:18178

Sources EV-e2c62d0bbcacf4b77ec19e5b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 20c4565c0433d977eac2c7c3c6aab0e85f90cf97eb44715a9bf47de692c51c53

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:18177

Sources EV-0a5b419e5ef4cbad9439ae81
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1ce4c7bfd0466b1bac8e4e585cd271d187803da656a16e7abe40a10d4249e41c

Usage terms US government public domain

Source snapshots by date · USA · eia860

Intel Santa Clara / NTL00

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID57128
Utility NameBloom Energy
Plant Code60224
Plant NameIntel Santa Clara
StateCA
CountySanta Clara
Generator IDNTL00
TechnologyOther Natural Gas
Prime MoverFC
OwnershipW
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)1.1
Summer Capacity (MW)1
Winter Capacity (MW)1
Minimum Load (MW)1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month1
Operating Year2015
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1NG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full LoadOVER
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:18178

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:18178

Sources EV-e2c62d0bbcacf4b77ec19e5b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 20c4565c0433d977eac2c7c3c6aab0e85f90cf97eb44715a9bf47de692c51c53

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Intel Santa Clara / NTL00

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID57128
Entity NameBloom Energy
Plant ID60224
Plant NameIntel Santa Clara
Google MapMap
Bing MapMap
Plant StateCA
CountySanta Clara
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDNTL00
Nameplate Capacity (MW)1.1
Net Summer Capacity (MW)1
Net Winter Capacity (MW)1
TechnologyOther Natural Gas
Energy Source CodeNG
Prime Mover CodeFC
Operating Month1
Operating Year2015
Status(OP) Operating
Latitude37.384745
Longitude-121.9638
Original text(OP) Operating
source_record_idOperating:18177

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:18177

Sources EV-0a5b419e5ef4cbad9439ae81
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1ce4c7bfd0466b1bac8e4e585cd271d187803da656a16e7abe40a10d4249e41c

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel