POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

L V Sutton Combined Cycle / CT2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)221 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d82661eb0842bb012644ba56
Net Summer Capacity (MW)173 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d82661eb0842bb012644ba56
Net Winter Capacity (MW)219 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d82661eb0842bb012644ba56
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID58697
Plant NameL V Sutton Combined Cycle
Google MapMap
Bing MapMap
Plant StateNC
CountyNew Hanover
Balancing Authority CodeCPLE
SectorElectric Utility
Generator IDCT2
Unit Code1
Nameplate Capacity (MW)221
Net Summer Capacity (MW)173
Net Winter Capacity (MW)219
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month11
Operating Year2013
Status(OP) Operating
Latitude34.283056
Longitude-77.98528
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:16552

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:16551

Sources EV-78336e6d047ef1b30fba9bb7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 922345e6b346542f70da6962900259704f83c0ca3ec45c070f49851ef76dd061

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:16552

Sources EV-d82661eb0842bb012644ba56
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 00f65032f3061af7c6695fb58e35fc46653d789df40084745458165099cedf88

Usage terms US government public domain

Source snapshots by date · USA · eia860m

L V Sutton Combined Cycle / CT2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID58697
Plant NameL V Sutton Combined Cycle
Google MapMap
Bing MapMap
Plant StateNC
CountyNew Hanover
Balancing Authority CodeCPLE
SectorElectric Utility
Generator IDCT2
Unit Code1
Nameplate Capacity (MW)221
Net Summer Capacity (MW)173
Net Winter Capacity (MW)219
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month11
Operating Year2013
Status(OP) Operating
Latitude34.283056
Longitude-77.98528
Original text(OP) Operating
source_record_idOperating:16552

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:16552

Sources EV-d82661eb0842bb012644ba56
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 00f65032f3061af7c6695fb58e35fc46653d789df40084745458165099cedf88

Usage terms US government public domain

Source snapshots by date · USA · eia860

L V Sutton Combined Cycle / CT2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID3046
Utility NameDuke Energy Progress - (NC)
Plant Code58697
Plant NameL V Sutton Combined Cycle
StateNC
CountyNew Hanover
Generator IDCT2
TechnologyNatural Gas Fired Combined Cycle
Prime MoverCT
Unit Code1
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?Y
Nameplate Capacity (MW)221
Nameplate Power Factor0.85
Summer Capacity (MW)173
Winter Capacity (MW)219
Minimum Load (MW)173
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month11
Operating Year2013
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Energy Source 2DFO
Time from Cold Shutdown to Full Load1H
Multiple Fuels?Y
Cofire Fuels?N
Switch Between Oil and Natural Gas?Y
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:16551

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:16551

Sources EV-78336e6d047ef1b30fba9bb7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 922345e6b346542f70da6962900259704f83c0ca3ec45c070f49851ef76dd061

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel