Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
The Andersons Albion Ethanol LLC / 9611
Generator · Out of service
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
2 MW
Original source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year As-of date 2026-08 Sources EV-d1b5f5af938beaff033264d4
Net Summer Capacity (MW)
1.2 MW
Original source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year As-of date 2026-08 Sources EV-d1b5f5af938beaff033264d4
Net Winter Capacity (MW)
1.2 MW
Original source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year As-of date 2026-08 Sources EV-d1b5f5af938beaff033264d4
Detailed source fields
Original source field
Published value or condition
Entity ID
58313
Entity Name
The Andersons Albion Ethanol LLC
Plant ID
58330
Plant Name
The Andersons Albion Ethanol LLC
Google Map
Map
Bing Map
Map
Plant State
MI
County
Calhoun
Balancing Authority Code
MISO
Sector
Industrial CHP
Generator ID
9611
Nameplate Capacity (MW)
2
Net Summer Capacity (MW)
1.2
Net Winter Capacity (MW)
1.2
Technology
Natural Gas Steam Turbine
Energy Source Code
NG
Prime Mover Code
ST
Operating Month
8
Operating Year
2006
Status
(OA) Out of service but expected to return to service in next calendar year
Latitude
42.256111
Longitude
-84.78833
Original text
(OA) Out of service but expected to return to service in next calendar year