La Luz Energy Center / 0001

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)42.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-272f4e7d4ecced250df70b05
Net Summer Capacity (MW)40 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-272f4e7d4ecced250df70b05
Net Winter Capacity (MW)41 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-272f4e7d4ecced250df70b05
Detailed source fields
Original source fieldPublished value or condition
Entity ID15473
Entity NamePublic Service Co of NM
Plant ID58284
Plant NameLa Luz Energy Center
Google MapMap
Bing MapMap
Plant StateNM
CountyValencia
Balancing Authority CodePNM
SectorElectric Utility
Generator ID0001
Nameplate Capacity (MW)42.3
Net Summer Capacity (MW)40
Net Winter Capacity (MW)41
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month12
Operating Year2015
Status(OP) Operating
Latitude34.616111
Longitude-106.815
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:15979

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:15978

Sources EV-daecf2babe2ab782601e7f3a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cd34cdadbdb7dc221995438aa83c85d18d110ffdc69334ced4510cbd92da4239

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:15979

Sources EV-272f4e7d4ecced250df70b05
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 562a40be609f630a5b0c9a3c75584d0dcaf18bdfc19c05945f8b48b367da7641

Usage terms US government public domain

Source snapshots by date · USA · eia860

La Luz Energy Center / 0001

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID15473
Utility NamePublic Service Co of NM
Plant Code58284
Plant NameLa Luz Energy Center
StateNM
CountyValencia
Generator ID0001
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)42.3
Nameplate Power Factor0.85
Summer Capacity (MW)40
Winter Capacity (MW)41
Minimum Load (MW)10
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month12
Operating Year2015
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Startup Source 1NG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:15978

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:15978

Sources EV-daecf2babe2ab782601e7f3a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cd34cdadbdb7dc221995438aa83c85d18d110ffdc69334ced4510cbd92da4239

Usage terms US government public domain

Source snapshots by date · USA · eia860m

La Luz Energy Center / 0001

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID15473
Entity NamePublic Service Co of NM
Plant ID58284
Plant NameLa Luz Energy Center
Google MapMap
Bing MapMap
Plant StateNM
CountyValencia
Balancing Authority CodePNM
SectorElectric Utility
Generator ID0001
Nameplate Capacity (MW)42.3
Net Summer Capacity (MW)40
Net Winter Capacity (MW)41
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month12
Operating Year2015
Status(OP) Operating
Latitude34.616111
Longitude-106.815
Original text(OP) Operating
source_record_idOperating:15979

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:15979

Sources EV-272f4e7d4ecced250df70b05
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 562a40be609f630a5b0c9a3c75584d0dcaf18bdfc19c05945f8b48b367da7641

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel