This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Kaiser Downey / KRSO3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ab06e91f673975bad5f174ca
Net Summer Capacity (MW)0.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ab06e91f673975bad5f174ca
Net Winter Capacity (MW)0.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ab06e91f673975bad5f174ca
Detailed source fields
Original source fieldPublished value or condition
Entity ID56778
Entity NameBloom Energy 2009 PPA
Plant ID58128
Plant NameKaiser Downey
Google MapMap
Bing MapMap
Plant StateCA
CountyLos Angeles
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDKRSO3
Nameplate Capacity (MW)0.2
Net Summer Capacity (MW)0.2
Net Winter Capacity (MW)0.2
TechnologyOther Natural Gas
Energy Source CodeNG
Prime Mover CodeFC
Operating Month6
Operating Year2012
Status(OP) Operating
Latitude33.919167
Longitude-118.1286
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:15718

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:15717

Sources EV-2d1afed4e5449dac3b16eeb9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 338f02cbe2b1b1d4055ce9ae26f63a5049fef685b6cd4b355583efd8ae15791f

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:15718

Sources EV-ab06e91f673975bad5f174ca
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 74cdccf4c21ff5b6bd23c6ac4b56205962dc639ec4ca825aa435af28aa8ea384

Usage terms US government public domain

Source snapshots by date · USA · eia860

Kaiser Downey / KRSO3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID56778
Utility NameBloom Energy 2009 PPA
Plant Code58128
Plant NameKaiser Downey
StateCA
CountyLos Angeles
Generator IDKRSO3
TechnologyOther Natural Gas
Prime MoverFC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.2
Summer Capacity (MW)0.2
Winter Capacity (MW)0.2
Minimum Load (MW)0.2
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year2012
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1NG
Time from Cold Shutdown to Full Load12H
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:15717

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:15717

Sources EV-2d1afed4e5449dac3b16eeb9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 338f02cbe2b1b1d4055ce9ae26f63a5049fef685b6cd4b355583efd8ae15791f

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Kaiser Downey / KRSO3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID56778
Entity NameBloom Energy 2009 PPA
Plant ID58128
Plant NameKaiser Downey
Google MapMap
Bing MapMap
Plant StateCA
CountyLos Angeles
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDKRSO3
Nameplate Capacity (MW)0.2
Net Summer Capacity (MW)0.2
Net Winter Capacity (MW)0.2
TechnologyOther Natural Gas
Energy Source CodeNG
Prime Mover CodeFC
Operating Month6
Operating Year2012
Status(OP) Operating
Latitude33.919167
Longitude-118.1286
Original text(OP) Operating
source_record_idOperating:15718

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:15718

Sources EV-ab06e91f673975bad5f174ca
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 74cdccf4c21ff5b6bd23c6ac4b56205962dc639ec4ca825aa435af28aa8ea384

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel