POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Intel Folsom / 2 Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 0.5 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-f5d55ed71cbe65cac466d450 Net Summer Capacity (MW) 0.5 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-f5d55ed71cbe65cac466d450 Net Winter Capacity (MW) 0.5 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-f5d55ed71cbe65cac466d450 DC Net Capacity (MW) 0.6 MWdc Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-f5d55ed71cbe65cac466d450
Detailed source fields Original source field Published value or condition Entity ID 57313 Entity Name Tesla Inc. Plant ID 58086 Plant Name Intel Folsom Google Map Map Bing Map Map Plant State CA County Sacramento Balancing Authority Code BANC Sector IPP Non-CHP Generator ID 2 Nameplate Capacity (MW) 0.5 Net Summer Capacity (MW) 0.5 Net Winter Capacity (MW) 0.5 Technology Solar Photovoltaic Energy Source Code SUN Prime Mover Code PV Operating Month 7 Operating Year 2010 Status (OP) Operating DC Net Capacity (MW) 0.6 Latitude 38.645119 Longitude -121.173 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:15667
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:15666
Sources EV-7571135ee9f1cdd319ee974f Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 9e9baffa186c348edc54469d6202f5df4c7158240ba79c3862a3a3e411ce53a8 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:15667
Sources EV-f5d55ed71cbe65cac466d450 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 021f157b32ad7ca26197c6223b4914d6af1a0b3057afec7d2003f55397346816 Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860 Intel Folsom / 2 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 57313 Utility Name Tesla Inc. Plant Code 58086 Plant Name Intel Folsom State CA County Sacramento Generator ID 2 Technology Solar Photovoltaic Prime Mover PV Ownership W Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 0.5 Summer Capacity (MW) 0.5 Winter Capacity (MW) 0.5 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 7 Operating Year 2010 Associated with Combined Heat and Power System N Sector Name IPP Non-CHP Sector 2 Topping or Bottoming X Energy Source 1 SUN Solid Fuel Gasification System? N Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:15666
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:15666
Sources EV-7571135ee9f1cdd319ee974f Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 9e9baffa186c348edc54469d6202f5df4c7158240ba79c3862a3a3e411ce53a8 Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860m Intel Folsom / 2 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 57313 Entity Name Tesla Inc. Plant ID 58086 Plant Name Intel Folsom Google Map Map Bing Map Map Plant State CA County Sacramento Balancing Authority Code BANC Sector IPP Non-CHP Generator ID 2 Nameplate Capacity (MW) 0.5 Net Summer Capacity (MW) 0.5 Net Winter Capacity (MW) 0.5 Technology Solar Photovoltaic Energy Source Code SUN Prime Mover Code PV Operating Month 7 Operating Year 2010 Status (OP) Operating DC Net Capacity (MW) 0.6 Latitude 38.645119 Longitude -121.173 Original text (OP) Operating source_record_id Operating:15667
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:15667
Sources EV-f5d55ed71cbe65cac466d450 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 021f157b32ad7ca26197c6223b4914d6af1a0b3057afec7d2003f55397346816 Usage terms US government public domain
Observations for this power asset