This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Battle Creek Mill / 2TG

Generator · Out of service

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2 MWOriginal source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year
As-of date 2026-08
Sources EV-130c9dc2b20b28e18f42403a
Net Summer Capacity (MW)0.8 MWOriginal source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year
As-of date 2026-08
Sources EV-130c9dc2b20b28e18f42403a
Net Winter Capacity (MW)1 MWOriginal source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year
As-of date 2026-08
Sources EV-130c9dc2b20b28e18f42403a
DC Net Capacity (MW)0 MWdcOriginal source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year
As-of date 2026-08
Sources EV-130c9dc2b20b28e18f42403a
Planned Uprate of Summer Capacity (MW)0.8 MWOriginal source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year
As-of date 2026-08
Sources EV-130c9dc2b20b28e18f42403a
Detailed source fields
Original source fieldPublished value or condition
Entity ID57427
Entity NameRockTenn-Battle Creek Mill
Plant ID58052
Plant NameBattle Creek Mill
Google MapMap
Bing MapMap
Plant StateMI
CountyCalhoun
Balancing Authority CodeMISO
SectorIndustrial Non-CHP
Generator ID2TG
Nameplate Capacity (MW)2
Net Summer Capacity (MW)0.8
Net Winter Capacity (MW)1
TechnologyNatural Gas Steam Turbine
Energy Source CodeNG
Prime Mover CodeST
Operating Month1
Operating Year1951
Status(OA) Out of service but expected to return to service in next calendar year
DC Net Capacity (MW)0
Planned Uprate Year2026
Planned Uprate Month10
Planned Uprate of Summer Capacity (MW)0.8
Latitude42.3221
Longitude-85.2043
Original text(OA) Out of service but expected to return to service in next calendar year
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:15627

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:15626

Sources EV-c7a15d87cdf2f99b6e60abe4
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2ab3c5006fa65bd42c81a9a32a0c514389fd5ee2675392d4a997586e3eecd03f

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:15627

Sources EV-130c9dc2b20b28e18f42403a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 888827296cc06704c0236a8690d8614f8d0dc2b83e794cc6815f5373b03e20cd

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Battle Creek Mill / 2TG

Generator · Out of service

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID57427
Entity NameRockTenn-Battle Creek Mill
Plant ID58052
Plant NameBattle Creek Mill
Google MapMap
Bing MapMap
Plant StateMI
CountyCalhoun
Balancing Authority CodeMISO
SectorIndustrial Non-CHP
Generator ID2TG
Nameplate Capacity (MW)2
Net Summer Capacity (MW)0.8
Net Winter Capacity (MW)1
TechnologyNatural Gas Steam Turbine
Energy Source CodeNG
Prime Mover CodeST
Operating Month1
Operating Year1951
Status(OA) Out of service but expected to return to service in next calendar year
DC Net Capacity (MW)0
Planned Uprate Year2026
Planned Uprate Month10
Planned Uprate of Summer Capacity (MW)0.8
Latitude42.3221
Longitude-85.2043
Original text(OA) Out of service but expected to return to service in next calendar year
source_record_idOperating:15627

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:15627

Sources EV-130c9dc2b20b28e18f42403a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 888827296cc06704c0236a8690d8614f8d0dc2b83e794cc6815f5373b03e20cd

Usage terms US government public domain

Source snapshots by date · USA · eia860

Battle Creek Mill / 2TG

Generator · Out of service

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID57427
Utility NameRockTenn-Battle Creek Mill
Plant Code58052
Plant NameBattle Creek Mill
StateMI
CountyCalhoun
Generator ID2TG
TechnologyNatural Gas Steam Turbine
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2
Nameplate Power Factor0.8
Summer Capacity (MW)0.8
Winter Capacity (MW)1
Minimum Load (MW)0.8
Uprate or Derate Completed During YearN
StatusOA
Synchronized to Transmission GridX
Operating Month1
Operating Year1951
Associated with Combined Heat and Power SystemN
Sector NameIndustrial Non-CHP
Sector6
Topping or BottomingX
Energy Source 1NG
Startup Source 1NG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load12H
Planned Net Summer Capacity Uprate (MW)0.8
Planned Net Winter Capacity Uprate (MW)0.8
Planned Uprate Month4
Planned Uprate Year2026
Multiple Fuels?N
Cofire Fuels?N
Original textOA
source_record_id3_1_Generator_Y2025.xlsx#Operable:15626

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:15626

Sources EV-c7a15d87cdf2f99b6e60abe4
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2ab3c5006fa65bd42c81a9a32a0c514389fd5ee2675392d4a997586e3eecd03f

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel