Berkshire Wind Power Project / HN-8

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-08bbda14f3faf22813f76f2f
Net Summer Capacity (MW)2.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-08bbda14f3faf22813f76f2f
Net Winter Capacity (MW)2.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-08bbda14f3faf22813f76f2f
Detailed source fields
Original source fieldPublished value or condition
Entity ID11806
Entity NameMassachusetts Mun Wholes Electric Co
Plant ID57721
Plant NameBerkshire Wind Power Project
Google MapMap
Bing MapMap
Plant StateMA
CountyBerkshire
Balancing Authority CodeISNE
SectorElectric Utility
Generator IDHN-8
Nameplate Capacity (MW)2.3
Net Summer Capacity (MW)2.3
Net Winter Capacity (MW)2.3
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month9
Operating Year2019
Status(OP) Operating
Latitude42.586667
Longitude-73.275
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:15182

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:15181

Sources EV-9a65d6d3bfe727b6a79bf806
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8626ca047a6242c261c5e1844d93557062c87a1fad935b97f5bdd85ddc5828e0

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:15182

Sources EV-08bbda14f3faf22813f76f2f
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4754525d8ff45fc3b1a453db7e6a910c16e759c8da005fd7d7d1b31310943fd0

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Berkshire Wind Power Project / HN-8

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID11806
Entity NameMassachusetts Mun Wholes Electric Co
Plant ID57721
Plant NameBerkshire Wind Power Project
Google MapMap
Bing MapMap
Plant StateMA
CountyBerkshire
Balancing Authority CodeISNE
SectorElectric Utility
Generator IDHN-8
Nameplate Capacity (MW)2.3
Net Summer Capacity (MW)2.3
Net Winter Capacity (MW)2.3
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month9
Operating Year2019
Status(OP) Operating
Latitude42.586667
Longitude-73.275
Original text(OP) Operating
source_record_idOperating:15182

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:15182

Sources EV-08bbda14f3faf22813f76f2f
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4754525d8ff45fc3b1a453db7e6a910c16e759c8da005fd7d7d1b31310943fd0

Usage terms US government public domain

Source snapshots by date · USA · eia860

Berkshire Wind Power Project / HN-8

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID11806
Utility NameMassachusetts Mun Wholes Electric Co
Plant Code57721
Plant NameBerkshire Wind Power Project
StateMA
CountyBerkshire
Generator IDHN-8
TechnologyOnshore Wind Turbine
Prime MoverWT
OwnershipW
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node Designation7604
RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERC.Z.WCMASS
Nameplate Capacity (MW)2.3
Nameplate Power Factor0.95
Summer Capacity (MW)2.3
Winter Capacity (MW)2.3
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month9
Operating Year2019
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WND
Solid Fuel Gasification System?N
Turbines or Hydrokinetic Buoys1
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:15181

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:15181

Sources EV-9a65d6d3bfe727b6a79bf806
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8626ca047a6242c261c5e1844d93557062c87a1fad935b97f5bdd85ddc5828e0

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel