Power assets and projects · USA · eia860m

Caltech Central / CL09

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a41ebd52a9a4b0e9c1885ce7
Net Summer Capacity (MW)0.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a41ebd52a9a4b0e9c1885ce7
Net Winter Capacity (MW)0.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a41ebd52a9a4b0e9c1885ce7
Detailed source fields
Original source fieldPublished value or condition
Entity ID56778
Entity NameBloom Energy 2009 PPA
Plant ID57460
Plant NameCaltech Central
Google MapMap
Bing MapMap
Plant StateCA
CountyLos Angeles
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDCL09
Nameplate Capacity (MW)0.1
Net Summer Capacity (MW)0.1
Net Winter Capacity (MW)0.1
TechnologyOther Natural Gas
Energy Source CodeNG
Prime Mover CodeFC
Operating Month11
Operating Year2010
Planned Retirement Month3
Planned Retirement Year2031
Status(OP) Operating
Latitude34.1358
Longitude-118.1267
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:14893

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14893

Sources EV-50d0ab41f449979036fdf5ee
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 27a73add7d4c6d5d18da971b012e06d0a3bccc8be8bdcf03e87763d9a136fca9

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14893

Sources EV-a41ebd52a9a4b0e9c1885ce7
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 63df6c8f543c4420090a71a21593e2f974ce51d7604917aba86c52b5e7d46db1

Usage terms US government public domain

Source snapshots by date · USA · eia860

Caltech Central / CL09

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID56778
Utility NameBloom Energy 2009 PPA
Plant Code57460
Plant NameCaltech Central
StateCA
CountyLos Angeles
Generator IDCL09
TechnologyOther Natural Gas
Prime MoverFC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.1
Summer Capacity (MW)0.1
Winter Capacity (MW)0.1
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month11
Operating Year2010
Planned Retirement Month3
Planned Retirement Year2031
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1NG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load12H
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:14893

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14893

Sources EV-50d0ab41f449979036fdf5ee
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 27a73add7d4c6d5d18da971b012e06d0a3bccc8be8bdcf03e87763d9a136fca9

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Caltech Central / CL09

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID56778
Entity NameBloom Energy 2009 PPA
Plant ID57460
Plant NameCaltech Central
Google MapMap
Bing MapMap
Plant StateCA
CountyLos Angeles
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDCL09
Nameplate Capacity (MW)0.1
Net Summer Capacity (MW)0.1
Net Winter Capacity (MW)0.1
TechnologyOther Natural Gas
Energy Source CodeNG
Prime Mover CodeFC
Operating Month11
Operating Year2010
Planned Retirement Month3
Planned Retirement Year2031
Status(OP) Operating
Latitude34.1358
Longitude-118.1267
Original text(OP) Operating
source_record_idOperating:14893

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14893

Sources EV-a41ebd52a9a4b0e9c1885ce7
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 63df6c8f543c4420090a71a21593e2f974ce51d7604917aba86c52b5e7d46db1

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel