POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Caltech Central / CL00

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c1394623438330b97663c858
Net Summer Capacity (MW)0.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c1394623438330b97663c858
Net Winter Capacity (MW)0.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c1394623438330b97663c858
Detailed source fields
Original source fieldPublished value or condition
Entity ID56778
Entity NameBloom Energy 2009 PPA
Plant ID57460
Plant NameCaltech Central
Google MapMap
Bing MapMap
Plant StateCA
CountyLos Angeles
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDCL00
Nameplate Capacity (MW)0.1
Net Summer Capacity (MW)0.1
Net Winter Capacity (MW)0.1
TechnologyOther Natural Gas
Energy Source CodeNG
Prime Mover CodeFC
Operating Month11
Operating Year2010
Planned Retirement Month3
Planned Retirement Year2031
Status(OP) Operating
Latitude34.1358
Longitude-118.1267
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:14884

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14884

Sources EV-e6a237863e72729535bbbbf6
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7e8d1236a86f2d15fd96e58f867d40297e667fe035ccf8a275e7897ba4717e3e

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14884

Sources EV-c1394623438330b97663c858
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b9f8e584379d023909ca46492dd95dc38b66f761e80560bc566c6927d1f96660

Usage terms US government public domain

Source snapshots by date · USA · eia860

Caltech Central / CL00

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID56778
Utility NameBloom Energy 2009 PPA
Plant Code57460
Plant NameCaltech Central
StateCA
CountyLos Angeles
Generator IDCL00
TechnologyOther Natural Gas
Prime MoverFC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.1
Summer Capacity (MW)0.1
Winter Capacity (MW)0.1
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month11
Operating Year2010
Planned Retirement Month3
Planned Retirement Year2031
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1NG
Solid Fuel Gasification System?N
Time from Cold Shutdown to Full Load12H
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:14884

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14884

Sources EV-e6a237863e72729535bbbbf6
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7e8d1236a86f2d15fd96e58f867d40297e667fe035ccf8a275e7897ba4717e3e

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Caltech Central / CL00

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID56778
Entity NameBloom Energy 2009 PPA
Plant ID57460
Plant NameCaltech Central
Google MapMap
Bing MapMap
Plant StateCA
CountyLos Angeles
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDCL00
Nameplate Capacity (MW)0.1
Net Summer Capacity (MW)0.1
Net Winter Capacity (MW)0.1
TechnologyOther Natural Gas
Energy Source CodeNG
Prime Mover CodeFC
Operating Month11
Operating Year2010
Planned Retirement Month3
Planned Retirement Year2031
Status(OP) Operating
Latitude34.1358
Longitude-118.1267
Original text(OP) Operating
source_record_idOperating:14884

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14884

Sources EV-c1394623438330b97663c858
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b9f8e584379d023909ca46492dd95dc38b66f761e80560bc566c6927d1f96660

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel