POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Cedar Hills / 13

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-34c881488744e8ebdbabb66c
Net Summer Capacity (MW)0.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-34c881488744e8ebdbabb66c
Net Winter Capacity (MW)0.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-34c881488744e8ebdbabb66c
Detailed source fields
Original source fieldPublished value or condition
Entity ID67614
Entity NameKing County Solid Waste Division
Plant ID57298
Plant NameCedar Hills
Google MapMap
Bing MapMap
Plant StateWA
CountyKing
Balancing Authority CodePSEI
SectorIPP Non-CHP
Generator ID13
Nameplate Capacity (MW)0.3
Net Summer Capacity (MW)0.3
Net Winter Capacity (MW)0.3
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month4
Operating Year2009
Status(OP) Operating
Latitude47.455833
Longitude-122.0428
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:14672

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14670

Sources EV-bd59c9397045acc6426af44f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 732954a114d01db6d3ac161074c881f1259105a77a22d8f2dd6283d5f042f6ff

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14672

Sources EV-34c881488744e8ebdbabb66c
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 205222dc328cb7589bd605632027e1f69d123a7bc904aa06ff784fe0715392ce

Usage terms US government public domain

Source snapshots by date · USA · eia860

Cedar Hills / 13

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID67614
Utility NameKing County Solid Waste Division
Plant Code57298
Plant NameCedar Hills
StateWA
CountyKing
Generator ID13
TechnologyLandfill Gas
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.3
Nameplate Power Factor1
Summer Capacity (MW)0.3
Winter Capacity (MW)0.3
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month4
Operating Year2009
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1LFG
Energy Source 2DFO
Startup Source 1DFO
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?Y
Cofire Fuels?Y
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:14670

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14670

Sources EV-bd59c9397045acc6426af44f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 732954a114d01db6d3ac161074c881f1259105a77a22d8f2dd6283d5f042f6ff

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Cedar Hills / 13

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID67614
Entity NameKing County Solid Waste Division
Plant ID57298
Plant NameCedar Hills
Google MapMap
Bing MapMap
Plant StateWA
CountyKing
Balancing Authority CodePSEI
SectorIPP Non-CHP
Generator ID13
Nameplate Capacity (MW)0.3
Net Summer Capacity (MW)0.3
Net Winter Capacity (MW)0.3
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month4
Operating Year2009
Status(OP) Operating
Latitude47.455833
Longitude-122.0428
Original text(OP) Operating
source_record_idOperating:14672

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14672

Sources EV-34c881488744e8ebdbabb66c
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 205222dc328cb7589bd605632027e1f69d123a7bc904aa06ff784fe0715392ce

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel