Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

High Point, POLO / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6820109f3a79b69f0aeb4d32
Net Summer Capacity (MW)1.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6820109f3a79b69f0aeb4d32
Net Winter Capacity (MW)1.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6820109f3a79b69f0aeb4d32
Detailed source fields
Original source fieldPublished value or condition
Entity ID13630
Entity NameNorth Carolina Mun Power Agny #1
Plant ID57196
Plant NameHigh Point, POLO
Google MapMap
Bing MapMap
Plant StateNC
CountyGuilford
Balancing Authority CodeDUK
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)1.8
Net Summer Capacity (MW)1.8
Net Winter Capacity (MW)1.8
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month11
Operating Year2007
Status(OP) Operating
Latitude35.97
Longitude-79.96
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:14582

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14580

Sources EV-5a2feb1a10b47d52984aeebc
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1398f360abe242ffa9315d63ece38532e91bd2023d20de9463c39dc5a1178495

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14582

Sources EV-6820109f3a79b69f0aeb4d32
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 996690a81f93fcd09993160b0a4896268c46aef9d83bee307b176d31d313298b

Usage terms US government public domain

Source snapshots by date · USA · eia860

High Point, POLO / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID13630
Utility NameNorth Carolina Mun Power Agny #1
Plant Code57196
Plant NameHigh Point, POLO
StateNC
CountyGuilford
Generator ID1
TechnologyPetroleum Liquids
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)1.8
Nameplate Power Factor0.8
Summer Capacity (MW)1.8
Winter Capacity (MW)1.8
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month11
Operating Year2007
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1DFO
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:14580

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14580

Sources EV-5a2feb1a10b47d52984aeebc
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1398f360abe242ffa9315d63ece38532e91bd2023d20de9463c39dc5a1178495

Usage terms US government public domain

Source snapshots by date · USA · eia860m

High Point, POLO / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID13630
Entity NameNorth Carolina Mun Power Agny #1
Plant ID57196
Plant NameHigh Point, POLO
Google MapMap
Bing MapMap
Plant StateNC
CountyGuilford
Balancing Authority CodeDUK
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)1.8
Net Summer Capacity (MW)1.8
Net Winter Capacity (MW)1.8
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month11
Operating Year2007
Status(OP) Operating
Latitude35.97
Longitude-79.96
Original text(OP) Operating
source_record_idOperating:14582

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14582

Sources EV-6820109f3a79b69f0aeb4d32
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 996690a81f93fcd09993160b0a4896268c46aef9d83bee307b176d31d313298b

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel