Hoosier Wind Project LLC / TBD

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)106 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-757b38bf450e2e66926b6dda
Net Summer Capacity (MW)106 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-757b38bf450e2e66926b6dda
Net Winter Capacity (MW)106 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-757b38bf450e2e66926b6dda
Detailed source fields
Original source fieldPublished value or condition
Entity ID9273
Entity NameAES Indiana
Plant ID56878
Plant NameHoosier Wind Project LLC
Google MapMap
Bing MapMap
Plant StateIN
CountyBenton
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDTBD
Nameplate Capacity (MW)106
Net Summer Capacity (MW)106
Net Winter Capacity (MW)106
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month11
Operating Year2009
Status(OP) Operating
Latitude40.7178
Longitude-87.2631
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:14064

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14067

Sources EV-87b75ce0b0f35dcbfbbee4d7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 57188b3a5568cdc402db70a6ddcbf9ff401d2af523c098cae377acdccd22c111

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14064

Sources EV-757b38bf450e2e66926b6dda
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5170eb0b97b87ffcd0c7e3aa846294a685da78f13f4aca61809e1c0bd3c1609f

Usage terms US government public domain

Source snapshots by date · USA · eia860

Hoosier Wind Project LLC / TBD

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID9273
Utility NameAES Indiana
Plant Code56878
Plant NameHoosier Wind Project LLC
StateIN
CountyBenton
Generator IDTBD
TechnologyOnshore Wind Turbine
Prime MoverWT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)106
Summer Capacity (MW)106
Winter Capacity (MW)106
Minimum Load (MW)0
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month11
Operating Year2009
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WND
Solid Fuel Gasification System?N
Turbines or Hydrokinetic Buoys50
Other Combustion Technology?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:14067

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14067

Sources EV-87b75ce0b0f35dcbfbbee4d7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 57188b3a5568cdc402db70a6ddcbf9ff401d2af523c098cae377acdccd22c111

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Hoosier Wind Project LLC / TBD

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID9273
Entity NameAES Indiana
Plant ID56878
Plant NameHoosier Wind Project LLC
Google MapMap
Bing MapMap
Plant StateIN
CountyBenton
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDTBD
Nameplate Capacity (MW)106
Net Summer Capacity (MW)106
Net Winter Capacity (MW)106
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month11
Operating Year2009
Status(OP) Operating
Latitude40.7178
Longitude-87.2631
Original text(OP) Operating
source_record_idOperating:14064

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14064

Sources EV-757b38bf450e2e66926b6dda
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5170eb0b97b87ffcd0c7e3aa846294a685da78f13f4aca61809e1c0bd3c1609f

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel