POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Bryon Center / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6761ee82360a1676b634a499
Net Summer Capacity (MW)1.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6761ee82360a1676b634a499
Net Winter Capacity (MW)1.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6761ee82360a1676b634a499
Detailed source fields
Original source fieldPublished value or condition
Entity ID55858
Entity NameEnergy Developments, Inc d/b/a EDL
Plant ID56851
Plant NameBryon Center
Google MapMap
Bing MapMap
Plant StateMI
CountyKENT
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator ID2
Nameplate Capacity (MW)1.6
Net Summer Capacity (MW)1.5
Net Winter Capacity (MW)1.5
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month3
Operating Year2009
Status(OP) Operating
Latitude42.7814
Longitude-85.6728
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:14029

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14032

Sources EV-945844bc298a33df58f1067c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 04893c46ceafb846acc9c8f95df4187feee4122c6254ea17127a8c5ae8decbb8

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14029

Sources EV-6761ee82360a1676b634a499
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0391c1d2d42ac9fed3fbfb86051c2a898dff874410f319cfa0616e84c7d3a61c

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Bryon Center / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID55858
Entity NameEnergy Developments, Inc d/b/a EDL
Plant ID56851
Plant NameBryon Center
Google MapMap
Bing MapMap
Plant StateMI
CountyKENT
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator ID2
Nameplate Capacity (MW)1.6
Net Summer Capacity (MW)1.5
Net Winter Capacity (MW)1.5
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month3
Operating Year2009
Status(OP) Operating
Latitude42.7814
Longitude-85.6728
Original text(OP) Operating
source_record_idOperating:14029

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14029

Sources EV-6761ee82360a1676b634a499
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0391c1d2d42ac9fed3fbfb86051c2a898dff874410f319cfa0616e84c7d3a61c

Usage terms US government public domain

Source snapshots by date · USA · eia860

Bryon Center / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID55858
Utility NameEnergy Developments, Inc d/b/a EDL
Plant Code56851
Plant NameBryon Center
StateMI
CountyKENT
Generator ID2
TechnologyLandfill Gas
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)1.6
Nameplate Power Factor1
Summer Capacity (MW)1.5
Winter Capacity (MW)1.5
Minimum Load (MW)1.2
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month3
Operating Year2009
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1LFG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:14032

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14032

Sources EV-945844bc298a33df58f1067c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 04893c46ceafb846acc9c8f95df4187feee4122c6254ea17127a8c5ae8decbb8

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel