Power assets and projects · USA · eia860m

Woodfin / 1

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)45.5 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-cb914be6c1cbcc46026a12fc
Net Summer Capacity (MW)40 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-cb914be6c1cbcc46026a12fc
Net Winter Capacity (MW)45.5 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-cb914be6c1cbcc46026a12fc
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID56849
Plant NameWoodfin
Google MapMap
Bing MapMap
Plant StateNC
CountyBuncombe
Balancing Authority CodeCPLE
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)45.5
Net Summer Capacity (MW)40
Net Winter Capacity (MW)45.5
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Latitude35.65
Longitude-82.5575
Original textCanceled or Postponed
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idCanceled or Postponed:455

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:4567

Sources EV-c017822fc91e2934b92dcbc1
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d7defc9e5f81547dfdc1ca88990bae9fef3f8084d47bc73bf6add53dd751ea4f

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:455

Sources EV-cb914be6c1cbcc46026a12fc
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f0fbfb4b8ceddb9408b3eb5b03817490407aa6c10fc8f0c42d73444d88b56845

Usage terms US government public domain

Source snapshots by date · USA · eia860

Woodfin / 1

Generator · Cancelled

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID3046
Utility NameDuke Energy Progress - (NC)
Plant Code56849
Plant NameWoodfin
StateNC
CountyBuncombe
Generator ID1
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)45.5
Summer Capacity (MW)40
Winter Capacity (MW)45.5
Uprate or Derate Completed During YearN
StatusCN
Synchronized to Transmission GridX
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Cofire Fuels?N
Switch Between Oil and Natural Gas?Y
Original textCN
source_record_id3_1_Generator_Y2025.xlsx#Retired and Canceled:4567

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:4567

Sources EV-c017822fc91e2934b92dcbc1
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d7defc9e5f81547dfdc1ca88990bae9fef3f8084d47bc73bf6add53dd751ea4f

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Woodfin / 1

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID56849
Plant NameWoodfin
Google MapMap
Bing MapMap
Plant StateNC
CountyBuncombe
Balancing Authority CodeCPLE
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)45.5
Net Summer Capacity (MW)40
Net Winter Capacity (MW)45.5
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Latitude35.65
Longitude-82.5575
Original textCanceled or Postponed
source_record_idCanceled or Postponed:455

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:455

Sources EV-cb914be6c1cbcc46026a12fc
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f0fbfb4b8ceddb9408b3eb5b03817490407aa6c10fc8f0c42d73444d88b56845

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel