POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Virginia City Hybrid Energy Center / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)668 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-4a122aadf8bcf2a28d7c86e3
Net Summer Capacity (MW)610 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-4a122aadf8bcf2a28d7c86e3
Net Winter Capacity (MW)621.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-4a122aadf8bcf2a28d7c86e3
Detailed source fields
Original source fieldPublished value or condition
Entity ID19876
Entity NameVirginia Electric & Power Co
Plant ID56808
Plant NameVirginia City Hybrid Energy Center
Google MapMap
Bing MapMap
Plant StateVA
CountyWise
Balancing Authority CodePJM
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)668
Net Summer Capacity (MW)610
Net Winter Capacity (MW)621.5
TechnologyConventional Steam Coal
Energy Source CodeBIT
Prime Mover CodeST
Operating Month7
Operating Year2012
Status(OP) Operating
Latitude36.916389
Longitude-82.33806
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:13979

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:13982

Sources EV-3288f140fd2905073d4910fb
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f26342535409cc3c170687f896b4c946f44eb9fce60487abfc6dff2e33fcdbb0

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:13979

Sources EV-4a122aadf8bcf2a28d7c86e3
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b0d2b2526279d25f0d2f8b4063acbf8313ca9c5828d14492b7ecdcfeaec0d7e0

Usage terms US government public domain

Source snapshots by date · USA · eia860

Virginia City Hybrid Energy Center / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID19876
Utility NameVirginia Electric & Power Co
Plant Code56808
Plant NameVirginia City Hybrid Energy Center
StateVA
CountyWise
Generator ID1
TechnologyConventional Steam Coal
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)668
Nameplate Power Factor0.9
Summer Capacity (MW)610
Winter Capacity (MW)621.5
Minimum Load (MW)295
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month7
Operating Year2012
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1BIT
Energy Source 2WDS
Energy Source 3DFO
Startup Source 1DFO
Solid Fuel Gasification System?N
Time from Cold Shutdown to Full LoadOVER
Fluidized Bed Technology?Y
Subcritical Technology?Y
Multiple Fuels?Y
Cofire Fuels?Y
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:13982

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:13982

Sources EV-3288f140fd2905073d4910fb
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f26342535409cc3c170687f896b4c946f44eb9fce60487abfc6dff2e33fcdbb0

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Virginia City Hybrid Energy Center / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID19876
Entity NameVirginia Electric & Power Co
Plant ID56808
Plant NameVirginia City Hybrid Energy Center
Google MapMap
Bing MapMap
Plant StateVA
CountyWise
Balancing Authority CodePJM
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)668
Net Summer Capacity (MW)610
Net Winter Capacity (MW)621.5
TechnologyConventional Steam Coal
Energy Source CodeBIT
Prime Mover CodeST
Operating Month7
Operating Year2012
Status(OP) Operating
Latitude36.916389
Longitude-82.33806
Original text(OP) Operating
source_record_idOperating:13979

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:13979

Sources EV-4a122aadf8bcf2a28d7c86e3
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b0d2b2526279d25f0d2f8b4063acbf8313ca9c5828d14492b7ecdcfeaec0d7e0

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel