Power assets and projects · USA · eia860m

Dempsey Ridge Wind Farm / DR

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)132 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-cbf02b2b63a5e8ae83e02daf
Net Summer Capacity (MW)132 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-cbf02b2b63a5e8ae83e02daf
Net Winter Capacity (MW)132 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-cbf02b2b63a5e8ae83e02daf
Detailed source fields
Original source fieldPublished value or condition
Entity ID55918
Entity NameAcciona Wind Energy USA LLC
Plant ID56665
Plant NameDempsey Ridge Wind Farm
Google MapMap
Bing MapMap
Plant StateOK
CountyRoger Mills
Balancing Authority CodeSWPP
SectorIPP Non-CHP
Generator IDDR
Nameplate Capacity (MW)132
Net Summer Capacity (MW)132
Net Winter Capacity (MW)132
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month5
Operating Year2012
Status(OP) Operating
Latitude35.529778
Longitude-99.81446
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:13549

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:13552

Sources EV-6cb4825a3a776847d02f85f8
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a6f5b87d610de9ca06d45231e50e33fe9fcaa47c67026d0ca95c37c9ae1e4385

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:13549

Sources EV-cbf02b2b63a5e8ae83e02daf
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a1fe4668fbeb30b8d5f47a8bcaf6fb8752d2d83dc3fdc89fbfcc725a0f8d94a5

Usage terms US government public domain

Source snapshots by date · USA · eia860

Dempsey Ridge Wind Farm / DR

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID55918
Utility NameAcciona Wind Energy USA LLC
Plant Code56665
Plant NameDempsey Ridge Wind Farm
StateOK
CountyRoger Mills
Generator IDDR
TechnologyOnshore Wind Turbine
Prime MoverWT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationDEMPSEY_RIDGE_WIND
RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERCDEMPSEY_RIDGE_WIND
Nameplate Capacity (MW)132
Summer Capacity (MW)132
Winter Capacity (MW)132
Minimum Load (MW)0
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month5
Operating Year2012
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1WND
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Turbines or Hydrokinetic Buoys66
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:13552

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:13552

Sources EV-6cb4825a3a776847d02f85f8
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a6f5b87d610de9ca06d45231e50e33fe9fcaa47c67026d0ca95c37c9ae1e4385

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Dempsey Ridge Wind Farm / DR

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID55918
Entity NameAcciona Wind Energy USA LLC
Plant ID56665
Plant NameDempsey Ridge Wind Farm
Google MapMap
Bing MapMap
Plant StateOK
CountyRoger Mills
Balancing Authority CodeSWPP
SectorIPP Non-CHP
Generator IDDR
Nameplate Capacity (MW)132
Net Summer Capacity (MW)132
Net Winter Capacity (MW)132
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month5
Operating Year2012
Status(OP) Operating
Latitude35.529778
Longitude-99.81446
Original text(OP) Operating
source_record_idOperating:13549

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:13549

Sources EV-cbf02b2b63a5e8ae83e02daf
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a1fe4668fbeb30b8d5f47a8bcaf6fb8752d2d83dc3fdc89fbfcc725a0f8d94a5

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel