Power assets and projects · USA · eia860m

Buffalo Gap 2 Wind Farm / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)232.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-8ea3ac9abf2f869e53285ee2
Net Summer Capacity (MW)232.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-8ea3ac9abf2f869e53285ee2
Net Winter Capacity (MW)232.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-8ea3ac9abf2f869e53285ee2
Detailed source fields
Original source fieldPublished value or condition
Entity ID61012
Entity NameAES Distributed Energy
Plant ID56484
Plant NameBuffalo Gap 2 Wind Farm
Google MapMap
Bing MapMap
Plant StateTX
CountyNolan
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator ID1
Nameplate Capacity (MW)232.5
Net Summer Capacity (MW)232.5
Net Winter Capacity (MW)232.5
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month7
Operating Year2007
Status(OP) Operating
Latitude32.318221
Longitude-100.177
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:13280

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:13283

Sources EV-250bec5212ee51ddfe4e2849
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 50ba8714c8e21ecd6a9727bc491e5c723003e8eec95376fec090d95372518cdf

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:13280

Sources EV-8ea3ac9abf2f869e53285ee2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e0c42ee7114c9c691598823cc1f257050b816a4b340af3bc33aa21ebe0b9a546

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Buffalo Gap 2 Wind Farm / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID61012
Entity NameAES Distributed Energy
Plant ID56484
Plant NameBuffalo Gap 2 Wind Farm
Google MapMap
Bing MapMap
Plant StateTX
CountyNolan
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator ID1
Nameplate Capacity (MW)232.5
Net Summer Capacity (MW)232.5
Net Winter Capacity (MW)232.5
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month7
Operating Year2007
Status(OP) Operating
Latitude32.318221
Longitude-100.177
Original text(OP) Operating
source_record_idOperating:13280

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:13280

Sources EV-8ea3ac9abf2f869e53285ee2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e0c42ee7114c9c691598823cc1f257050b816a4b340af3bc33aa21ebe0b9a546

Usage terms US government public domain

Source snapshots by date · USA · eia860

Buffalo Gap 2 Wind Farm / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID61012
Utility NameAES Distributed Energy
Plant Code56484
Plant NameBuffalo Gap 2 Wind Farm
StateTX
CountyNolan
Generator ID1
TechnologyOnshore Wind Turbine
Prime MoverWT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)232.5
Summer Capacity (MW)232.5
Winter Capacity (MW)232.5
Minimum Load (MW)0
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month7
Operating Year2007
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1WND
Turbines or Hydrokinetic Buoys155
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:13283

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:13283

Sources EV-250bec5212ee51ddfe4e2849
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 50ba8714c8e21ecd6a9727bc491e5c723003e8eec95376fec090d95372518cdf

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel