POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 62 MW Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-5cc152c92c7f201b9d7e31de Net Summer Capacity (MW) 56 MW Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-5cc152c92c7f201b9d7e31de Net Winter Capacity (MW) 61 MW Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-5cc152c92c7f201b9d7e31de
Detailed source fields Original source field Published value or condition Entity ID 18454 Entity Name Tampa Electric Co Plant ID 56352 Plant Name Tampa Electric Co NA 2 Google Map Map Bing Map Map Plant State FL County Hillsborough Balancing Authority Code TEC Sector Electric Utility Generator ID 4 Nameplate Capacity (MW) 62 Net Summer Capacity (MW) 56 Net Winter Capacity (MW) 61 Technology Natural Gas Fired Combustion Turbine Energy Source Code NG Prime Mover Code GT Latitude 27.9072 Longitude -82.4231 Original text Canceled or Postponed Coordinate accuracy source_precision_not_independently_surveyed source_record_id Canceled or Postponed:411
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:4425
Sources EV-29705dc02e7decc11c40309f Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 1b171397cf4c2eec7d90ce6dda450dd6b2b7e1ed894a455e7696ea24bde79ffa Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:411
Sources EV-5cc152c92c7f201b9d7e31de Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 9b5a4b91b37b624ba7b7497445c4cac84d85a28b969695f377cb118880d90a0d Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860 Tampa Electric Co NA 2 / 4 Generator · Cancelled
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 18454 Utility Name Tampa Electric Co Plant Code 56352 Plant Name Tampa Electric Co NA 2 State FL County Hillsborough Generator ID 4 Technology Natural Gas Fired Combustion Turbine Prime Mover GT Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 62 Summer Capacity (MW) 56 Winter Capacity (MW) 61 Uprate or Derate Completed During Year N Status CN Synchronized to Transmission Grid X Sector Name Electric Utility Sector 1 Energy Source 1 NG Original text CN source_record_id 3_1_Generator_Y2025.xlsx#Retired and Canceled:4425
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:4425
Sources EV-29705dc02e7decc11c40309f Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 1b171397cf4c2eec7d90ce6dda450dd6b2b7e1ed894a455e7696ea24bde79ffa Usage terms US government public domain
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 18454 Entity Name Tampa Electric Co Plant ID 56352 Plant Name Tampa Electric Co NA 2 Google Map Map Bing Map Map Plant State FL County Hillsborough Balancing Authority Code TEC Sector Electric Utility Generator ID 4 Nameplate Capacity (MW) 62 Net Summer Capacity (MW) 56 Net Winter Capacity (MW) 61 Technology Natural Gas Fired Combustion Turbine Energy Source Code NG Prime Mover Code GT Latitude 27.9072 Longitude -82.4231 Original text Canceled or Postponed source_record_id Canceled or Postponed:411
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:411
Sources EV-5cc152c92c7f201b9d7e31de Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 9b5a4b91b37b624ba7b7497445c4cac84d85a28b969695f377cb118880d90a0d Usage terms US government public domain