POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Laurel Ridge LFGTE / 3

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.8 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-81fa74b892ecad8459487e47
Net Summer Capacity (MW)0.8 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-81fa74b892ecad8459487e47
Net Winter Capacity (MW)0.8 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-81fa74b892ecad8459487e47
Detailed source fields
Original source fieldPublished value or condition
Entity ID5580
Entity NameEast Kentucky Power Coop, Inc
Plant ID56279
Plant NameLaurel Ridge LFGTE
Google MapMap
Bing MapMap
Plant StateKY
CountyLaurel
Balancing Authority CodePJM
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.8
Net Winter Capacity (MW)0.8
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month9
Operating Year2003
Retirement Month8
Retirement Year2023
Latitude37.035
Longitude-84.0933
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:846

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:4396

Sources EV-176ca38ce44aea0bed2a2336
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2271f12fc68383bd0da624134ac1a86b34d15c629b75325fa7dba8c013704d57

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:846

Sources EV-81fa74b892ecad8459487e47
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 52b81544ae90557fee9827b17bffd7f69267e0969481517c4220c273cc597efa

Usage terms US government public domain

Source snapshots by date · USA · eia860

Laurel Ridge LFGTE / 3

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5580
Utility NameEast Kentucky Power Coop, Inc
Plant Code56279
Plant NameLaurel Ridge LFGTE
StateKY
CountyLaurel
Generator ID3
TechnologyLandfill Gas
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.8
Nameplate Power Factor0.8
Summer Capacity (MW)0.8
Winter Capacity (MW)0.8
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusRE
Synchronized to Transmission GridX
Operating Month9
Operating Year2003
Retirement Month8
Retirement Year2023
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1LFG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textRE
source_record_id3_1_Generator_Y2025.xlsx#Retired and Canceled:4396

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:4396

Sources EV-176ca38ce44aea0bed2a2336
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2271f12fc68383bd0da624134ac1a86b34d15c629b75325fa7dba8c013704d57

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Laurel Ridge LFGTE / 3

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5580
Entity NameEast Kentucky Power Coop, Inc
Plant ID56279
Plant NameLaurel Ridge LFGTE
Google MapMap
Bing MapMap
Plant StateKY
CountyLaurel
Balancing Authority CodePJM
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.8
Net Winter Capacity (MW)0.8
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month9
Operating Year2003
Retirement Month8
Retirement Year2023
Latitude37.035
Longitude-84.0933
Original textRetired
source_record_idRetired:846

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:846

Sources EV-81fa74b892ecad8459487e47
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 52b81544ae90557fee9827b17bffd7f69267e0969481517c4220c273cc597efa

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel