Power assets and projects · USA · eia860m

Ontario LFGTE / GEN4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d10b4806039eb50098004e65
Net Summer Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d10b4806039eb50098004e65
Net Winter Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d10b4806039eb50098004e65
Detailed source fields
Original source fieldPublished value or condition
Entity ID17283
Entity NameSeneca Energy II
Plant ID56250
Plant NameOntario LFGTE
Google MapMap
Bing MapMap
Plant StateNY
CountyOntario
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator IDGEN4
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.8
Net Winter Capacity (MW)0.8
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month11
Operating Year2003
Status(OP) Operating
Latitude42.8586
Longitude-77.0872
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:12936

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:12937

Sources EV-ca2696f3c246b66ba425ce9b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 abdac0edf799fcb54a5081658693fb674d8a2eee0c9a83f3fd4beafd3fcf456e

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:12936

Sources EV-d10b4806039eb50098004e65
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e0692dcf0d992013666799cf2e021ac9f5517c27ba00fc9a085106f2e9424928

Usage terms US government public domain

Source snapshots by date · USA · eia860

Ontario LFGTE / GEN4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID17283
Utility NameSeneca Energy II
Plant Code56250
Plant NameOntario LFGTE
StateNY
CountyOntario
Generator IDGEN4
TechnologyLandfill Gas
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.8
Nameplate Power Factor0.8
Summer Capacity (MW)0.8
Winter Capacity (MW)0.8
Minimum Load (MW)0.6
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month11
Operating Year2003
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1LFG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:12937

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:12937

Sources EV-ca2696f3c246b66ba425ce9b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 abdac0edf799fcb54a5081658693fb674d8a2eee0c9a83f3fd4beafd3fcf456e

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Ontario LFGTE / GEN4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID17283
Entity NameSeneca Energy II
Plant ID56250
Plant NameOntario LFGTE
Google MapMap
Bing MapMap
Plant StateNY
CountyOntario
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator IDGEN4
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.8
Net Winter Capacity (MW)0.8
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month11
Operating Year2003
Status(OP) Operating
Latitude42.8586
Longitude-77.0872
Original text(OP) Operating
source_record_idOperating:12936

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:12936

Sources EV-d10b4806039eb50098004e65
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e0692dcf0d992013666799cf2e021ac9f5517c27ba00fc9a085106f2e9424928

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel