POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Allendorf / WT

Generator · Out of service

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2 MWOriginal source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year
As-of date 2026-08
Sources EV-85fca52dd168d5a2a1c71489
Net Summer Capacity (MW)2 MWOriginal source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year
As-of date 2026-08
Sources EV-85fca52dd168d5a2a1c71489
Net Winter Capacity (MW)2 MWOriginal source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year
As-of date 2026-08
Sources EV-85fca52dd168d5a2a1c71489
Detailed source fields
Original source fieldPublished value or condition
Entity ID57202
Entity NameE&E Enterprises LLC
Plant ID56215
Plant NameAllendorf
Google MapMap
Bing MapMap
Plant StateIA
CountyOsceola
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDWT
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month5
Operating Year2003
Status(OS) Out of service and NOT expected to return to service in next calendar year
Latitude43.4
Longitude-95.6333
Original text(OS) Out of service and NOT expected to return to service in next calendar year
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:12890

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:12891

Sources EV-f35c9e2b1958a2eed562a3fb
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 44f950b090c746dc7a321c7b8358ccd134827169cbb609e150567757892a4bf1

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:12890

Sources EV-85fca52dd168d5a2a1c71489
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 68b9e3ec246fef4ea4ab6cbcce24c0288828033891e9637c68f8ee79a70fac0b

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Allendorf / WT

Generator · Out of service

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID57202
Entity NameE&E Enterprises LLC
Plant ID56215
Plant NameAllendorf
Google MapMap
Bing MapMap
Plant StateIA
CountyOsceola
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDWT
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month5
Operating Year2003
Status(OS) Out of service and NOT expected to return to service in next calendar year
Latitude43.4
Longitude-95.6333
Original text(OS) Out of service and NOT expected to return to service in next calendar year
source_record_idOperating:12890

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:12890

Sources EV-85fca52dd168d5a2a1c71489
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 68b9e3ec246fef4ea4ab6cbcce24c0288828033891e9637c68f8ee79a70fac0b

Usage terms US government public domain

Source snapshots by date · USA · eia860

Allendorf / WT

Generator · Out of service

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID57202
Utility NameE&E Enterprises LLC
Plant Code56215
Plant NameAllendorf
StateIA
CountyOsceola
Generator IDWT
TechnologyOnshore Wind Turbine
Prime MoverWT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2
Summer Capacity (MW)2
Winter Capacity (MW)2
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusOS
Synchronized to Transmission GridX
Operating Month5
Operating Year2003
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1WND
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Turbines or Hydrokinetic Buoys1
Multiple Fuels?N
Original textOS
source_record_id3_1_Generator_Y2025.xlsx#Operable:12891

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:12891

Sources EV-f35c9e2b1958a2eed562a3fb
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 44f950b090c746dc7a321c7b8358ccd134827169cbb609e150567757892a4bf1

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel