Power assets and projects · USA · eia860m

McIntosh Combined Cycle Facility / 11ST

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)281.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-894fab75095097a51815ac07
Net Summer Capacity (MW)295 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-894fab75095097a51815ac07
Net Winter Capacity (MW)295 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-894fab75095097a51815ac07
Detailed source fields
Original source fieldPublished value or condition
Entity ID7140
Entity NameGeorgia Power Co
Plant ID56150
Plant NameMcIntosh Combined Cycle Facility
Google MapMap
Bing MapMap
Plant StateGA
CountyEffingham
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID11ST
Unit CodeG111
Nameplate Capacity (MW)281.9
Net Summer Capacity (MW)295
Net Winter Capacity (MW)295
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCA
Operating Month6
Operating Year2005
Status(OP) Operating
Latitude32.3478
Longitude-81.1817
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:12800

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:12801

Sources EV-92972331f3ed1809c433cda6
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 61244439ae07ea7129822b82e91ef8675bc8f0545e766a120ec5f7aaddbc7ba1

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:12800

Sources EV-894fab75095097a51815ac07
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0338068ed122455675dfd837665a6ebcdece71e3c4731a89e0f13a9ae8880690

Usage terms US government public domain

Source snapshots by date · USA · eia860

McIntosh Combined Cycle Facility / 11ST

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID7140
Utility NameGeorgia Power Co
Plant Code56150
Plant NameMcIntosh Combined Cycle Facility
StateGA
CountyEffingham
Generator ID11ST
TechnologyNatural Gas Fired Combined Cycle
Prime MoverCA
Unit CodeG111
OwnershipS
Duct BurnersY
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)281.9
Nameplate Power Factor0.9
Summer Capacity (MW)295
Winter Capacity (MW)295
Minimum Load (MW)130
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year2005
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Time from Cold Shutdown to Full Load12H
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:12801

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:12801

Sources EV-92972331f3ed1809c433cda6
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 61244439ae07ea7129822b82e91ef8675bc8f0545e766a120ec5f7aaddbc7ba1

Usage terms US government public domain

Source snapshots by date · USA · eia860m

McIntosh Combined Cycle Facility / 11ST

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID7140
Entity NameGeorgia Power Co
Plant ID56150
Plant NameMcIntosh Combined Cycle Facility
Google MapMap
Bing MapMap
Plant StateGA
CountyEffingham
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID11ST
Unit CodeG111
Nameplate Capacity (MW)281.9
Net Summer Capacity (MW)295
Net Winter Capacity (MW)295
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCA
Operating Month6
Operating Year2005
Status(OP) Operating
Latitude32.3478
Longitude-81.1817
Original text(OP) Operating
source_record_idOperating:12800

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:12800

Sources EV-894fab75095097a51815ac07
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0338068ed122455675dfd837665a6ebcdece71e3c4731a89e0f13a9ae8880690

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel