Power assets and projects · USA · eia860m

Jack River LLC / JR30

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-b7f0fa7d43ef69330299006b
Net Summer Capacity (MW)1.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-b7f0fa7d43ef69330299006b
Net Winter Capacity (MW)1.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-b7f0fa7d43ef69330299006b
Detailed source fields
Original source fieldPublished value or condition
Entity ID54725
Entity NameCHI Operations Inc
Plant ID55565
Plant NameJack River LLC
Google MapMap
Bing MapMap
Plant StateMN
CountyLincoln
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDJR30
Nameplate Capacity (MW)1.9
Net Summer Capacity (MW)1.9
Net Winter Capacity (MW)1.9
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month2
Operating Year2001
Status(OP) Operating
Latitude44.4233
Longitude-96.4411
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:12270

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:12271

Sources EV-ee67e4b98f286d288f538978
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2fb81f58377dc6f8d71139d17dab3e47b409ee0dec9a31f3cd23603de31155e6

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:12270

Sources EV-b7f0fa7d43ef69330299006b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 9a986cb84aa86b1e720019d988855b71a56df69e6d384bb99379fdc742943bab

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Jack River LLC / JR30

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID54725
Entity NameCHI Operations Inc
Plant ID55565
Plant NameJack River LLC
Google MapMap
Bing MapMap
Plant StateMN
CountyLincoln
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDJR30
Nameplate Capacity (MW)1.9
Net Summer Capacity (MW)1.9
Net Winter Capacity (MW)1.9
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month2
Operating Year2001
Status(OP) Operating
Latitude44.4233
Longitude-96.4411
Original text(OP) Operating
source_record_idOperating:12270

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:12270

Sources EV-b7f0fa7d43ef69330299006b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 9a986cb84aa86b1e720019d988855b71a56df69e6d384bb99379fdc742943bab

Usage terms US government public domain

Source snapshots by date · USA · eia860

Jack River LLC / JR30

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID54725
Utility NameCHI Operations Inc
Plant Code55565
Plant NameJack River LLC
StateMN
CountyLincoln
Generator IDJR30
TechnologyOnshore Wind Turbine
Prime MoverWT
OwnershipJ
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)1.9
Summer Capacity (MW)1.9
Winter Capacity (MW)1.9
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month2
Operating Year2001
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1WND
Solid Fuel Gasification System?N
Turbines or Hydrokinetic Buoys3
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:12271

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:12271

Sources EV-ee67e4b98f286d288f538978
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2fb81f58377dc6f8d71139d17dab3e47b409ee0dec9a31f3cd23603de31155e6

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel