POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Walton County Energy Facility / 103G

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)164.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-054ac615edecfabd1cb61812
Net Summer Capacity (MW)149.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-054ac615edecfabd1cb61812
Net Winter Capacity (MW)172 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-054ac615edecfabd1cb61812
Detailed source fields
Original source fieldPublished value or condition
Entity ID13994
Entity NameOglethorpe Power Corporation
Plant ID55128
Plant NameWalton County Energy Facility
Google MapMap
Bing MapMap
Plant StateGA
CountyWalton
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID103G
Nameplate Capacity (MW)164.7
Net Summer Capacity (MW)149.9
Net Winter Capacity (MW)172
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month6
Operating Year2001
Status(OP) Operating
Latitude33.8148
Longitude-83.6954
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:11421

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:11421

Sources EV-d9aacf68bd8310eebdc48213
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e18b6f82212212d204b344280ffa47b5ee2d96575fd01aa4d3cc0765b1a566f6

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:11421

Sources EV-054ac615edecfabd1cb61812
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ac98b4a7ef2c5d479356f9062962b948bd19e8184e9d8634fbd1de1875c740b4

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Walton County Energy Facility / 103G

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID13994
Entity NameOglethorpe Power Corporation
Plant ID55128
Plant NameWalton County Energy Facility
Google MapMap
Bing MapMap
Plant StateGA
CountyWalton
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID103G
Nameplate Capacity (MW)164.7
Net Summer Capacity (MW)149.9
Net Winter Capacity (MW)172
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month6
Operating Year2001
Status(OP) Operating
Latitude33.8148
Longitude-83.6954
Original text(OP) Operating
source_record_idOperating:11421

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:11421

Sources EV-054ac615edecfabd1cb61812
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ac98b4a7ef2c5d479356f9062962b948bd19e8184e9d8634fbd1de1875c740b4

Usage terms US government public domain

Source snapshots by date · USA · eia860

Walton County Energy Facility / 103G

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID13994
Utility NameOglethorpe Power Corporation
Plant Code55128
Plant NameWalton County Energy Facility
StateGA
CountyWalton
Generator ID103G
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipW
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)164.7
Nameplate Power Factor0.9
Summer Capacity (MW)149.9
Winter Capacity (MW)172
Minimum Load (MW)100
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year2001
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:11421

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:11421

Sources EV-d9aacf68bd8310eebdc48213
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e18b6f82212212d204b344280ffa47b5ee2d96575fd01aa4d3cc0765b1a566f6

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel