POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Walton County Energy Facility / 102G Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 164.7 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-edf6fbbfecb2a07e43decc47 Net Summer Capacity (MW) 149.9 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-edf6fbbfecb2a07e43decc47 Net Winter Capacity (MW) 172 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-edf6fbbfecb2a07e43decc47
Detailed source fields Original source field Published value or condition Entity ID 13994 Entity Name Oglethorpe Power Corporation Plant ID 55128 Plant Name Walton County Energy Facility Google Map Map Bing Map Map Plant State GA County Walton Balancing Authority Code SOCO Sector Electric Utility Generator ID 102G Nameplate Capacity (MW) 164.7 Net Summer Capacity (MW) 149.9 Net Winter Capacity (MW) 172 Technology Natural Gas Fired Combustion Turbine Energy Source Code NG Prime Mover Code GT Operating Month 6 Operating Year 2001 Status (OP) Operating Latitude 33.8148 Longitude -83.6954 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:11420
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:11420
Sources EV-4692de886e9dde07772d9e78 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 e28518a9ce0c7a914fbb187b2a4e73dfc71cf65cb64cd9fabcf5014528d7e50e Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:11420
Sources EV-edf6fbbfecb2a07e43decc47 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 08dc03584119c50d4dda1b09cbc3bc5e6b6ada658c52508a44c71485c74fd2e5 Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860 Walton County Energy Facility / 102G Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 13994 Utility Name Oglethorpe Power Corporation Plant Code 55128 Plant Name Walton County Energy Facility State GA County Walton Generator ID 102G Technology Natural Gas Fired Combustion Turbine Prime Mover GT Ownership W Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 164.7 Nameplate Power Factor 0.9 Summer Capacity (MW) 149.9 Winter Capacity (MW) 172 Minimum Load (MW) 100 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 6 Operating Year 2001 Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 NG Solid Fuel Gasification System? N Carbon Capture Technology? N Time from Cold Shutdown to Full Load 1H Multiple Fuels? N Cofire Fuels? N Switch Between Oil and Natural Gas? N Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:11420
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:11420
Sources EV-4692de886e9dde07772d9e78 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 e28518a9ce0c7a914fbb187b2a4e73dfc71cf65cb64cd9fabcf5014528d7e50e Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860m Walton County Energy Facility / 102G Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 13994 Entity Name Oglethorpe Power Corporation Plant ID 55128 Plant Name Walton County Energy Facility Google Map Map Bing Map Map Plant State GA County Walton Balancing Authority Code SOCO Sector Electric Utility Generator ID 102G Nameplate Capacity (MW) 164.7 Net Summer Capacity (MW) 149.9 Net Winter Capacity (MW) 172 Technology Natural Gas Fired Combustion Turbine Energy Source Code NG Prime Mover Code GT Operating Month 6 Operating Year 2001 Status (OP) Operating Latitude 33.8148 Longitude -83.6954 Original text (OP) Operating source_record_id Operating:11420
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:11420
Sources EV-edf6fbbfecb2a07e43decc47 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 08dc03584119c50d4dda1b09cbc3bc5e6b6ada658c52508a44c71485c74fd2e5 Usage terms US government public domain
Observations for this power asset