Power assets and projects · USA · eia860m

Walton County Energy Facility / 102G

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)164.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-edf6fbbfecb2a07e43decc47
Net Summer Capacity (MW)149.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-edf6fbbfecb2a07e43decc47
Net Winter Capacity (MW)172 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-edf6fbbfecb2a07e43decc47
Detailed source fields
Original source fieldPublished value or condition
Entity ID13994
Entity NameOglethorpe Power Corporation
Plant ID55128
Plant NameWalton County Energy Facility
Google MapMap
Bing MapMap
Plant StateGA
CountyWalton
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID102G
Nameplate Capacity (MW)164.7
Net Summer Capacity (MW)149.9
Net Winter Capacity (MW)172
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month6
Operating Year2001
Status(OP) Operating
Latitude33.8148
Longitude-83.6954
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:11420

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:11420

Sources EV-4692de886e9dde07772d9e78
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e28518a9ce0c7a914fbb187b2a4e73dfc71cf65cb64cd9fabcf5014528d7e50e

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:11420

Sources EV-edf6fbbfecb2a07e43decc47
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 08dc03584119c50d4dda1b09cbc3bc5e6b6ada658c52508a44c71485c74fd2e5

Usage terms US government public domain

Source snapshots by date · USA · eia860

Walton County Energy Facility / 102G

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID13994
Utility NameOglethorpe Power Corporation
Plant Code55128
Plant NameWalton County Energy Facility
StateGA
CountyWalton
Generator ID102G
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipW
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)164.7
Nameplate Power Factor0.9
Summer Capacity (MW)149.9
Winter Capacity (MW)172
Minimum Load (MW)100
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year2001
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:11420

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:11420

Sources EV-4692de886e9dde07772d9e78
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e28518a9ce0c7a914fbb187b2a4e73dfc71cf65cb64cd9fabcf5014528d7e50e

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Walton County Energy Facility / 102G

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID13994
Entity NameOglethorpe Power Corporation
Plant ID55128
Plant NameWalton County Energy Facility
Google MapMap
Bing MapMap
Plant StateGA
CountyWalton
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID102G
Nameplate Capacity (MW)164.7
Net Summer Capacity (MW)149.9
Net Winter Capacity (MW)172
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month6
Operating Year2001
Status(OP) Operating
Latitude33.8148
Longitude-83.6954
Original text(OP) Operating
source_record_idOperating:11420

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:11420

Sources EV-edf6fbbfecb2a07e43decc47
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 08dc03584119c50d4dda1b09cbc3bc5e6b6ada658c52508a44c71485c74fd2e5

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel