Power assets and projects · USA · eia860m

Mustang Station / GEN3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)172.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6affc9e9dc4bdb53149297c0
Net Summer Capacity (MW)157.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6affc9e9dc4bdb53149297c0
Net Winter Capacity (MW)142.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6affc9e9dc4bdb53149297c0
Detailed source fields
Original source fieldPublished value or condition
Entity ID7349
Entity NameGolden Spread Electric Cooperative, Inc
Plant ID55065
Plant NameMustang Station
Google MapMap
Bing MapMap
Plant StateTX
CountyYoakum
Balancing Authority CodeSWPP
SectorElectric Utility
Generator IDGEN3
Unit CodeCC1
Nameplate Capacity (MW)172.6
Net Summer Capacity (MW)157.9
Net Winter Capacity (MW)142.2
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCA
Operating Month4
Operating Year2000
Status(OP) Operating
Latitude32.9728
Longitude-102.7417
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:11301

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:11301

Sources EV-436aba3239a0d28aeed71ab9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c36520a7b5b155ba703721e3a7c6b1dee594a460e41675052620c0f559ab37f8

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:11301

Sources EV-6affc9e9dc4bdb53149297c0
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f104271a862ea761b534c67c2445a9e6a4ab6e4b65258e9ff06339ade1b3447e

Usage terms US government public domain

Source snapshots by date · USA · eia860

Mustang Station / GEN3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID7349
Utility NameGolden Spread Electric Cooperative, Inc
Plant Code55065
Plant NameMustang Station
StateTX
CountyYoakum
Generator IDGEN3
TechnologyNatural Gas Fired Combined Cycle
Prime MoverCA
Unit CodeCC1
OwnershipS
Duct BurnersY
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)172.6
Nameplate Power Factor0.9
Summer Capacity (MW)157.9
Winter Capacity (MW)142.2
Minimum Load (MW)115
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month4
Operating Year2000
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load12H
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:11301

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:11301

Sources EV-436aba3239a0d28aeed71ab9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c36520a7b5b155ba703721e3a7c6b1dee594a460e41675052620c0f559ab37f8

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Mustang Station / GEN3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID7349
Entity NameGolden Spread Electric Cooperative, Inc
Plant ID55065
Plant NameMustang Station
Google MapMap
Bing MapMap
Plant StateTX
CountyYoakum
Balancing Authority CodeSWPP
SectorElectric Utility
Generator IDGEN3
Unit CodeCC1
Nameplate Capacity (MW)172.6
Net Summer Capacity (MW)157.9
Net Winter Capacity (MW)142.2
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCA
Operating Month4
Operating Year2000
Status(OP) Operating
Latitude32.9728
Longitude-102.7417
Original text(OP) Operating
source_record_idOperating:11301

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:11301

Sources EV-6affc9e9dc4bdb53149297c0
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f104271a862ea761b534c67c2445a9e6a4ab6e4b65258e9ff06339ade1b3447e

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel