POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Rio Bravo / GT1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)150 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a5a097c627effb4c5458930b
Net Summer Capacity (MW)140.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a5a097c627effb4c5458930b
Net Winter Capacity (MW)149 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a5a097c627effb4c5458930b

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel