Power assets and projects · USA · eia860m

Seneca Energy / GE16

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-912836f7e5e0b59e117c92f8
Net Summer Capacity (MW)1.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-912836f7e5e0b59e117c92f8
Net Winter Capacity (MW)1.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-912836f7e5e0b59e117c92f8
Detailed source fields
Original source fieldPublished value or condition
Entity ID17283
Entity NameSeneca Energy II
Plant ID54782
Plant NameSeneca Energy
Google MapMap
Bing MapMap
Plant StateNY
CountySeneca
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator IDGE16
Nameplate Capacity (MW)1.6
Net Summer Capacity (MW)1.6
Net Winter Capacity (MW)1.6
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month1
Operating Year2007
Status(OP) Operating
Planned Repower Year2026
Planned Repower Month10
Latitude42.9281
Longitude-76.8408
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:10917

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:10915

Sources EV-efecde17ca5fb69c4546d2df
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cfc4a4c5653fe669377ce1011054909136ca0fe3cd3faf7b24649431f4519d0a

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:10917

Sources EV-912836f7e5e0b59e117c92f8
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1e54b8388aeabdf557753a449bd02423f68b6ce80d26e4c99e4fe4de36ec6983

Usage terms US government public domain

Source snapshots by date · USA · eia860

Seneca Energy / GE16

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID17283
Utility NameSeneca Energy II
Plant Code54782
Plant NameSeneca Energy
StateNY
CountySeneca
Generator IDGE16
TechnologyLandfill Gas
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)1.6
Nameplate Power Factor0.8
Summer Capacity (MW)1.6
Winter Capacity (MW)1.6
Minimum Load (MW)0.8
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month1
Operating Year2007
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1LFG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load1H
Planned New Prime MoverIC
Planned Energy Source 1NG
Planned New Nameplate Capacity (MW)1.6
Planned Repower Month10
Planned Repower Year2026
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:10915

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:10915

Sources EV-efecde17ca5fb69c4546d2df
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cfc4a4c5653fe669377ce1011054909136ca0fe3cd3faf7b24649431f4519d0a

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Seneca Energy / GE16

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID17283
Entity NameSeneca Energy II
Plant ID54782
Plant NameSeneca Energy
Google MapMap
Bing MapMap
Plant StateNY
CountySeneca
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator IDGE16
Nameplate Capacity (MW)1.6
Net Summer Capacity (MW)1.6
Net Winter Capacity (MW)1.6
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month1
Operating Year2007
Status(OP) Operating
Planned Repower Year2026
Planned Repower Month10
Latitude42.9281
Longitude-76.8408
Original text(OP) Operating
source_record_idOperating:10917

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:10917

Sources EV-912836f7e5e0b59e117c92f8
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1e54b8388aeabdf557753a449bd02423f68b6ce80d26e4c99e4fe4de36ec6983

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel