POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

I 95 Landfill Phase II / UNT4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ab73e103f4cb15b3687889f0
Net Summer Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ab73e103f4cb15b3687889f0
Net Winter Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ab73e103f4cb15b3687889f0
Detailed source fields
Original source fieldPublished value or condition
Entity ID57249
Entity NameNextEra Renewable Fuels, LLC
Plant ID54723
Plant NameI 95 Landfill Phase II
Google MapMap
Bing MapMap
Plant StateVA
CountyFairfax
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDUNT4
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.8
Net Winter Capacity (MW)0.8
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month3
Operating Year1993
Status(OP) Operating
Latitude38.6892
Longitude-77.2375
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:10844

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:10842

Sources EV-639e4ce1c76454348d390e59
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 18504651f1844b3b8839c9be621966ef7fca9e5e807072c98a89eb150eef925d

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:10844

Sources EV-ab73e103f4cb15b3687889f0
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 318ae88bcde90a4eec0084dd79d95ccc5b8e9d3f11946103c079d68123d075ab

Usage terms US government public domain

Source snapshots by date · USA · eia860

I 95 Landfill Phase II / UNT4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID57249
Utility NameNextEra Renewable Fuels, LLC
Plant Code54723
Plant NameI 95 Landfill Phase II
StateVA
CountyFairfax
Generator IDUNT4
TechnologyLandfill Gas
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.8
Nameplate Power Factor0.95
Summer Capacity (MW)0.8
Winter Capacity (MW)0.8
Minimum Load (MW)0.3
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month3
Operating Year1993
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1LFG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:10842

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:10842

Sources EV-639e4ce1c76454348d390e59
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 18504651f1844b3b8839c9be621966ef7fca9e5e807072c98a89eb150eef925d

Usage terms US government public domain

Source snapshots by date · USA · eia860m

I 95 Landfill Phase II / UNT4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID57249
Entity NameNextEra Renewable Fuels, LLC
Plant ID54723
Plant NameI 95 Landfill Phase II
Google MapMap
Bing MapMap
Plant StateVA
CountyFairfax
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDUNT4
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.8
Net Winter Capacity (MW)0.8
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month3
Operating Year1993
Status(OP) Operating
Latitude38.6892
Longitude-77.2375
Original text(OP) Operating
source_record_idOperating:10844

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:10844

Sources EV-ab73e103f4cb15b3687889f0
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 318ae88bcde90a4eec0084dd79d95ccc5b8e9d3f11946103c079d68123d075ab

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel