POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Mascoma Hydro / 03

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-29ce5e92248a368fe680766b
Net Summer Capacity (MW)0.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-29ce5e92248a368fe680766b
Net Winter Capacity (MW)0.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-29ce5e92248a368fe680766b
Detailed source fields
Original source fieldPublished value or condition
Entity ID7601
Entity NameGreen Mountain Power Corp
Plant ID54471
Plant NameMascoma Hydro
Google MapMap
Bing MapMap
Plant StateNH
CountyGrafton
Balancing Authority CodeISNE
SectorElectric Utility
Generator ID03
Nameplate Capacity (MW)0.5
Net Summer Capacity (MW)0.5
Net Winter Capacity (MW)0.5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month12
Operating Year1988
Status(OP) Operating
Latitude43.63369
Longitude-72.31744
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:10525

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:10523

Sources EV-df893171caba68f2daa531b8
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0c9580d0e0d3c9c6cd26091091b83c22a734bd48285486ae1cafda3dd1e3fcad

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:10525

Sources EV-29ce5e92248a368fe680766b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 72632a0e6583aff6d4360b1ce05218cf7c6a756a541544545847a37455dbb409

Usage terms US government public domain

Source snapshots by date · USA · eia860

Mascoma Hydro / 03

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID7601
Utility NameGreen Mountain Power Corp
Plant Code54471
Plant NameMascoma Hydro
StateNH
CountyGrafton
Generator ID03
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipW
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.5
Nameplate Power Factor1
Summer Capacity (MW)0.5
Winter Capacity (MW)0.5
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month12
Operating Year1988
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load10M
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:10523

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:10523

Sources EV-df893171caba68f2daa531b8
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0c9580d0e0d3c9c6cd26091091b83c22a734bd48285486ae1cafda3dd1e3fcad

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Mascoma Hydro / 03

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID7601
Entity NameGreen Mountain Power Corp
Plant ID54471
Plant NameMascoma Hydro
Google MapMap
Bing MapMap
Plant StateNH
CountyGrafton
Balancing Authority CodeISNE
SectorElectric Utility
Generator ID03
Nameplate Capacity (MW)0.5
Net Summer Capacity (MW)0.5
Net Winter Capacity (MW)0.5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month12
Operating Year1988
Status(OP) Operating
Latitude43.63369
Longitude-72.31744
Original text(OP) Operating
source_record_idOperating:10525

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:10525

Sources EV-29ce5e92248a368fe680766b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 72632a0e6583aff6d4360b1ce05218cf7c6a756a541544545847a37455dbb409

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel