POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Sibley Mill / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c815d10e78261a552045dd3a
Net Summer Capacity (MW)0.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c815d10e78261a552045dd3a
Net Winter Capacity (MW)0.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c815d10e78261a552045dd3a
Detailed source fields
Original source fieldPublished value or condition
Entity ID55810
Entity NameAugusta Canal Authority
Plant ID54322
Plant NameSibley Mill
Google MapMap
Bing MapMap
Plant StateGA
CountyRichmond
Balancing Authority CodeSOCO
SectorIndustrial Non-CHP
Generator ID3
Nameplate Capacity (MW)0.7
Net Summer Capacity (MW)0.7
Net Winter Capacity (MW)0.7
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1946
Status(OP) Operating
Latitude33.487881
Longitude-81.99252
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:10397

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:10394

Sources EV-adf50f5effb3305492972210
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a95390d510a45144cf8489a7bf420229c0f827e265013171e1db8e7137a96f75

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:10397

Sources EV-c815d10e78261a552045dd3a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 49f6105ecdfec843c745dfacaff88bdc28ea91e29a8c1ea875bd1ad71177de0e

Usage terms US government public domain

Source snapshots by date · USA · eia860

Sibley Mill / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID55810
Utility NameAugusta Canal Authority
Plant Code54322
Plant NameSibley Mill
StateGA
CountyRichmond
Generator ID3
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.7
Nameplate Power Factor0.9
Summer Capacity (MW)0.7
Winter Capacity (MW)0.7
Minimum Load (MW)0.4
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month1
Operating Year1946
Associated with Combined Heat and Power SystemN
Sector NameIndustrial Non-CHP
Sector6
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load1H
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:10394

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:10394

Sources EV-adf50f5effb3305492972210
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a95390d510a45144cf8489a7bf420229c0f827e265013171e1db8e7137a96f75

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Sibley Mill / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID55810
Entity NameAugusta Canal Authority
Plant ID54322
Plant NameSibley Mill
Google MapMap
Bing MapMap
Plant StateGA
CountyRichmond
Balancing Authority CodeSOCO
SectorIndustrial Non-CHP
Generator ID3
Nameplate Capacity (MW)0.7
Net Summer Capacity (MW)0.7
Net Winter Capacity (MW)0.7
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1946
Status(OP) Operating
Latitude33.487881
Longitude-81.99252
Original text(OP) Operating
source_record_idOperating:10397

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:10397

Sources EV-c815d10e78261a552045dd3a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 49f6105ecdfec843c745dfacaff88bdc28ea91e29a8c1ea875bd1ad71177de0e

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel