Power assets and projects · USA · eia860m

Hardee Power Station / GEN2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)95.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c781805aedcffac12b6af436
Net Summer Capacity (MW)70 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c781805aedcffac12b6af436
Net Winter Capacity (MW)85 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c781805aedcffac12b6af436
Detailed source fields
Original source fieldPublished value or condition
Entity ID49893
Entity NameInvenergy Services LLC
Plant ID50949
Plant NameHardee Power Station
Google MapMap
Bing MapMap
Plant StateFL
CountyHardee
Balancing Authority CodeTEC
SectorIPP Non-CHP
Generator IDGEN2
Unit CodeCC01
Nameplate Capacity (MW)95.9
Net Summer Capacity (MW)70
Net Winter Capacity (MW)85
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month1
Operating Year1993
Status(OP) Operating
Latitude27.6364
Longitude-81.9636
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:9919

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:9915

Sources EV-671bbf1c0a0220db638009d2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b93727ebd7e6661e00df40258d20118d68a46b31a79674ca3bda0a9222d43749

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:9919

Sources EV-c781805aedcffac12b6af436
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6f2bfd5082c1229aa8073dcd2a87981f33ab4e5bef8ab6c36701c2b7df0cbc5e

Usage terms US government public domain

Source snapshots by date · USA · eia860

Hardee Power Station / GEN2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID49893
Utility NameInvenergy Services LLC
Plant Code50949
Plant NameHardee Power Station
StateFL
CountyHardee
Generator IDGEN2
TechnologyNatural Gas Fired Combined Cycle
Prime MoverCT
Unit CodeCC01
OwnershipW
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?Y
Nameplate Capacity (MW)95.9
Nameplate Power Factor0.85
Summer Capacity (MW)70
Winter Capacity (MW)85
Minimum Load (MW)20
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month1
Operating Year1993
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1NG
Energy Source 2DFO
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?Y
Cofire Fuels?N
Switch Between Oil and Natural Gas?Y
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:9915

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:9915

Sources EV-671bbf1c0a0220db638009d2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b93727ebd7e6661e00df40258d20118d68a46b31a79674ca3bda0a9222d43749

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Hardee Power Station / GEN2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID49893
Entity NameInvenergy Services LLC
Plant ID50949
Plant NameHardee Power Station
Google MapMap
Bing MapMap
Plant StateFL
CountyHardee
Balancing Authority CodeTEC
SectorIPP Non-CHP
Generator IDGEN2
Unit CodeCC01
Nameplate Capacity (MW)95.9
Net Summer Capacity (MW)70
Net Winter Capacity (MW)85
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month1
Operating Year1993
Status(OP) Operating
Latitude27.6364
Longitude-81.9636
Original text(OP) Operating
source_record_idOperating:9919

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:9919

Sources EV-c781805aedcffac12b6af436
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6f2bfd5082c1229aa8073dcd2a87981f33ab4e5bef8ab6c36701c2b7df0cbc5e

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel