Power assets and projects · USA · eia860m

Galesville Project / GV2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d2f2937a7e71790330a6e552
Net Summer Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d2f2937a7e71790330a6e552
Net Winter Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d2f2937a7e71790330a6e552
Detailed source fields
Original source fieldPublished value or condition
Entity ID5187
Entity NameDouglas County - (OR)
Plant ID50938
Plant NameGalesville Project
Google MapMap
Bing MapMap
Plant StateOR
CountyDouglas
Balancing Authority CodePACW
SectorIPP Non-CHP
Generator IDGV2
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.8
Net Winter Capacity (MW)0.8
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month2
Operating Year1987
Status(OP) Operating
Latitude42.8489
Longitude-123.1778
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:9917

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:9913

Sources EV-cac7fcdd0766e1766fb2d01a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a2e2a9d19ce2fa9a45a8da1b0cd0f4e7abf1a7f1fb4248797b76c5a97ff41609

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:9917

Sources EV-d2f2937a7e71790330a6e552
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 d845629dfd9295c7b071d124c6343b0cbc1ef2ffea3082e96a272ce2bb785b60

Usage terms US government public domain

Source snapshots by date · USA · eia860

Galesville Project / GV2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5187
Utility NameDouglas County - (OR)
Plant Code50938
Plant NameGalesville Project
StateOR
CountyDouglas
Generator IDGV2
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.8
Nameplate Power Factor0.9
Summer Capacity (MW)0.8
Winter Capacity (MW)0.8
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month2
Operating Year1987
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:9913

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:9913

Sources EV-cac7fcdd0766e1766fb2d01a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a2e2a9d19ce2fa9a45a8da1b0cd0f4e7abf1a7f1fb4248797b76c5a97ff41609

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Galesville Project / GV2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5187
Entity NameDouglas County - (OR)
Plant ID50938
Plant NameGalesville Project
Google MapMap
Bing MapMap
Plant StateOR
CountyDouglas
Balancing Authority CodePACW
SectorIPP Non-CHP
Generator IDGV2
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.8
Net Winter Capacity (MW)0.8
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month2
Operating Year1987
Status(OP) Operating
Latitude42.8489
Longitude-123.1778
Original text(OP) Operating
source_record_idOperating:9917

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:9917

Sources EV-d2f2937a7e71790330a6e552
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 d845629dfd9295c7b071d124c6343b0cbc1ef2ffea3082e96a272ce2bb785b60

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel