Power assets and projects · USA · eia860m

Boulder Canyon Hydro / 1

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)10 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-3c53882a930db772b7a1217b
Net Summer Capacity (MW)5 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-3c53882a930db772b7a1217b
Net Winter Capacity (MW)5 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-3c53882a930db772b7a1217b
Detailed source fields
Original source fieldPublished value or condition
Entity ID1994
Entity NameBoulder, City of - (CO)
Plant ID466
Plant NameBoulder Canyon Hydro
Google MapMap
Bing MapMap
Plant StateCO
CountyBoulder
Balancing Authority CodePSCO
SectorIPP Non-CHP
Generator ID1
Nameplate Capacity (MW)10
Net Summer Capacity (MW)5
Net Winter Capacity (MW)5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month6
Operating Year1911
Retirement Month9
Retirement Year2012
Latitude40.004725
Longitude-105.3325
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:4524

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:235

Sources EV-0db89041e83b8fcf6947d21c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 513898d643fb2d49e8c0edfc1908300bda1b4ec4e7ba29dfbbca97ce5a56215a

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:4524

Sources EV-3c53882a930db772b7a1217b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 224e9972cb27df29a28db6249eec9c64c0de902240fd57b809872c5fd957cf92

Usage terms US government public domain

Source snapshots by date · USA · eia860

Boulder Canyon Hydro / 1

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID1994
Utility NameBoulder, City of - (CO)
Plant Code466
Plant NameBoulder Canyon Hydro
StateCO
CountyBoulder
Generator ID1
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)10
Nameplate Power Factor0
Summer Capacity (MW)5
Winter Capacity (MW)5
Minimum Load (MW)0
Uprate or Derate Completed During YearN
StatusRE
Synchronized to Transmission GridX
Operating Month6
Operating Year1911
Retirement Month9
Retirement Year2012
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load10M
Original textRE
source_record_id3_1_Generator_Y2025.xlsx#Retired and Canceled:235

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:235

Sources EV-0db89041e83b8fcf6947d21c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 513898d643fb2d49e8c0edfc1908300bda1b4ec4e7ba29dfbbca97ce5a56215a

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Boulder Canyon Hydro / 1

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID1994
Entity NameBoulder, City of - (CO)
Plant ID466
Plant NameBoulder Canyon Hydro
Google MapMap
Bing MapMap
Plant StateCO
CountyBoulder
Balancing Authority CodePSCO
SectorIPP Non-CHP
Generator ID1
Nameplate Capacity (MW)10
Net Summer Capacity (MW)5
Net Winter Capacity (MW)5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month6
Operating Year1911
Retirement Month9
Retirement Year2012
Latitude40.004725
Longitude-105.3325
Original textRetired
source_record_idRetired:4524

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:4524

Sources EV-3c53882a930db772b7a1217b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 224e9972cb27df29a28db6249eec9c64c0de902240fd57b809872c5fd957cf92

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel