Power assets and projects · USA · eia860m

Weston / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)350.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-08f2dcb41cbe7531f6443502
Net Summer Capacity (MW)334.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-08f2dcb41cbe7531f6443502
Net Winter Capacity (MW)339.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-08f2dcb41cbe7531f6443502
Detailed source fields
Original source fieldPublished value or condition
Entity ID20860
Entity NameWisconsin Public Service Corp
Plant ID4078
Plant NameWeston
Google MapMap
Bing MapMap
Plant StateWI
CountyMarathon
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)350.5
Net Summer Capacity (MW)334.7
Net Winter Capacity (MW)339.8
TechnologyConventional Steam Coal
Energy Source CodeSUB
Prime Mover CodeST
Operating Month12
Operating Year1981
Status(OP) Operating
Latitude44.8606
Longitude-89.6553
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:5709

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5703

Sources EV-e495daae83592ac8e9d3465a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 faa0f14be99e17ce6ae75e9e6f8cfd36de1359cc48bfd726a6d664d88d38271b

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5709

Sources EV-08f2dcb41cbe7531f6443502
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 d9b1f245f7e208f37acd5a339053847ea1386cf7aadb186ac2c014c47e6229bf

Usage terms US government public domain

Source snapshots by date · USA · eia860

Weston / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID20860
Utility NameWisconsin Public Service Corp
Plant Code4078
Plant NameWeston
StateWI
CountyMarathon
Generator ID3
TechnologyConventional Steam Coal
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationWPS.WESTON3
RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERCWPS.WESTON3
Nameplate Capacity (MW)350.5
Nameplate Power Factor0.9
Summer Capacity (MW)334.7
Winter Capacity (MW)339.8
Minimum Load (MW)105
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month12
Operating Year1981
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1SUB
Energy Source 2NG
Energy Source 3RC
Startup Source 1NG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full LoadOVER
Pulverized Coal Technology?Y
Subcritical Technology?Y
Other Planned Modifications?N
Multiple Fuels?Y
Cofire Fuels?Y
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:5703

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5703

Sources EV-e495daae83592ac8e9d3465a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 faa0f14be99e17ce6ae75e9e6f8cfd36de1359cc48bfd726a6d664d88d38271b

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Weston / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID20860
Entity NameWisconsin Public Service Corp
Plant ID4078
Plant NameWeston
Google MapMap
Bing MapMap
Plant StateWI
CountyMarathon
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)350.5
Net Summer Capacity (MW)334.7
Net Winter Capacity (MW)339.8
TechnologyConventional Steam Coal
Energy Source CodeSUB
Prime Mover CodeST
Operating Month12
Operating Year1981
Status(OP) Operating
Latitude44.8606
Longitude-89.6553
Original text(OP) Operating
source_record_idOperating:5709

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5709

Sources EV-08f2dcb41cbe7531f6443502
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 d9b1f245f7e208f37acd5a339053847ea1386cf7aadb186ac2c014c47e6229bf

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel