POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Ice Harbor / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)90 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-237653534f685fae7969668e
Net Summer Capacity (MW)90 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-237653534f685fae7969668e
Net Winter Capacity (MW)90 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-237653534f685fae7969668e
Detailed source fields
Original source fieldPublished value or condition
Entity ID19400
Entity NameUSACE Northwestern Division
Plant ID3925
Plant NameIce Harbor
Google MapMap
Bing MapMap
Plant StateWA
CountyWalla Walla
Balancing Authority CodeBPAT
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)90
Net Summer Capacity (MW)90
Net Winter Capacity (MW)90
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month3
Operating Year1962
Status(OP) Operating
Latitude46.249801
Longitude-118.8798
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:5477

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5472

Sources EV-653873df1d3657b2d3646125
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 48f19708fb09b8ae943a6dcdfb99032c075b20264856bac28c2e3e251094fee3

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5477

Sources EV-237653534f685fae7969668e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 aaa0bda0b3233c74789e967db2e499c877a2b13ae21db4c22e325d8f0b65d216

Usage terms US government public domain

Source snapshots by date · USA · eia860

Ice Harbor / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID19400
Utility NameUSACE Northwestern Division
Plant Code3925
Plant NameIce Harbor
StateWA
CountyWalla Walla
Generator ID2
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)90
Nameplate Power Factor0.95
Summer Capacity (MW)90
Winter Capacity (MW)90
Minimum Load (MW)35.7
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month3
Operating Year1962
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Time from Cold Shutdown to Full Load10M
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:5472

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5472

Sources EV-653873df1d3657b2d3646125
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 48f19708fb09b8ae943a6dcdfb99032c075b20264856bac28c2e3e251094fee3

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Ice Harbor / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID19400
Entity NameUSACE Northwestern Division
Plant ID3925
Plant NameIce Harbor
Google MapMap
Bing MapMap
Plant StateWA
CountyWalla Walla
Balancing Authority CodeBPAT
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)90
Net Summer Capacity (MW)90
Net Winter Capacity (MW)90
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month3
Operating Year1962
Status(OP) Operating
Latitude46.249801
Longitude-118.8798
Original text(OP) Operating
source_record_idOperating:5477

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5477

Sources EV-237653534f685fae7969668e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 aaa0bda0b3233c74789e967db2e499c877a2b13ae21db4c22e325d8f0b65d216

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel