Essex Junction 19 / H9

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3a7e6c2326bc7b90527a9a2c
Net Summer Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3a7e6c2326bc7b90527a9a2c
Net Winter Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3a7e6c2326bc7b90527a9a2c
Detailed source fields
Original source fieldPublished value or condition
Entity ID7601
Entity NameGreen Mountain Power Corp
Plant ID3737
Plant NameEssex Junction 19
Google MapMap
Bing MapMap
Plant StateVT
CountyChittenden
Balancing Authority CodeISNE
SectorElectric Utility
Generator IDH9
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.8
Net Winter Capacity (MW)0.8
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month3
Operating Year2008
Status(OP) Operating
Latitude44.4821
Longitude-73.1164
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:5199

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5194

Sources EV-c7915266e52534d9ec431716
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 fb0e1b2fb15a353fb741643a8e0bc0f02594d7e58c3430e32ed5511f6c2fb25b

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5199

Sources EV-3a7e6c2326bc7b90527a9a2c
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e6f73c9e06b338abf6b209a16ae3e845e84aa09fd927459771dc746222fe8fd7

Usage terms US government public domain

Source snapshots by date · USA · eia860

Essex Junction 19 / H9

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID7601
Utility NameGreen Mountain Power Corp
Plant Code3737
Plant NameEssex Junction 19
StateVT
CountyChittenden
Generator IDH9
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.8
Nameplate Power Factor0.8
Summer Capacity (MW)0.8
Winter Capacity (MW)0.8
Minimum Load (MW)0.3
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month3
Operating Year2008
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:5194

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5194

Sources EV-c7915266e52534d9ec431716
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 fb0e1b2fb15a353fb741643a8e0bc0f02594d7e58c3430e32ed5511f6c2fb25b

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Essex Junction 19 / H9

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID7601
Entity NameGreen Mountain Power Corp
Plant ID3737
Plant NameEssex Junction 19
Google MapMap
Bing MapMap
Plant StateVT
CountyChittenden
Balancing Authority CodeISNE
SectorElectric Utility
Generator IDH9
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.8
Net Winter Capacity (MW)0.8
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month3
Operating Year2008
Status(OP) Operating
Latitude44.4821
Longitude-73.1164
Original text(OP) Operating
source_record_idOperating:5199

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5199

Sources EV-3a7e6c2326bc7b90527a9a2c
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e6f73c9e06b338abf6b209a16ae3e845e84aa09fd927459771dc746222fe8fd7

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel