Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Cutler Hydro / 1 Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 15 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-5992b62c1cbe69f605b63fca Net Summer Capacity (MW) 15 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-5992b62c1cbe69f605b63fca Net Winter Capacity (MW) 15 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-5992b62c1cbe69f605b63fca
Detailed source fields Original source field Published value or condition Entity ID 14354 Entity Name PacifiCorp Plant ID 3646 Plant Name Cutler Hydro Google Map Map Bing Map Map Plant State UT County Box Elder Balancing Authority Code PACE Sector Electric Utility Generator ID 1 Nameplate Capacity (MW) 15 Net Summer Capacity (MW) 15 Net Winter Capacity (MW) 15 Technology Conventional Hydroelectric Energy Source Code WAT Prime Mover Code HY Operating Month 7 Operating Year 1927 Status (OP) Operating Latitude 41.834702 Longitude -112.0521 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:5131
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:5126
Sources EV-51fabcd27b5fce6aef73ac1c Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 86b45b5ddb0ce88c4fa890ba6e694aaf1af369bde4d3a76bdbd1c6d98120874c Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:5131
Sources EV-5992b62c1cbe69f605b63fca Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 26b729a172c3c8b15c34f2f67bd639820a970847a3a39205a8ad27ba09ff318a Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860 Cutler Hydro / 1 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 14354 Utility Name PacifiCorp Plant Code 3646 Plant Name Cutler Hydro State UT County Box Elder Generator ID 1 Technology Conventional Hydroelectric Prime Mover HY Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 15 Nameplate Power Factor 0.8 Summer Capacity (MW) 15 Winter Capacity (MW) 15 Minimum Load (MW) 0.1 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 7 Operating Year 1927 Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 WAT Solid Fuel Gasification System? N Carbon Capture Technology? N Time from Cold Shutdown to Full Load 10M Multiple Fuels? N Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:5126
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:5126
Sources EV-51fabcd27b5fce6aef73ac1c Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 86b45b5ddb0ce88c4fa890ba6e694aaf1af369bde4d3a76bdbd1c6d98120874c Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860m Cutler Hydro / 1 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 14354 Entity Name PacifiCorp Plant ID 3646 Plant Name Cutler Hydro Google Map Map Bing Map Map Plant State UT County Box Elder Balancing Authority Code PACE Sector Electric Utility Generator ID 1 Nameplate Capacity (MW) 15 Net Summer Capacity (MW) 15 Net Winter Capacity (MW) 15 Technology Conventional Hydroelectric Energy Source Code WAT Prime Mover Code HY Operating Month 7 Operating Year 1927 Status (OP) Operating Latitude 41.834702 Longitude -112.0521 Original text (OP) Operating source_record_id Operating:5131
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:5131
Sources EV-5992b62c1cbe69f605b63fca Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 26b729a172c3c8b15c34f2f67bd639820a970847a3a39205a8ad27ba09ff318a Usage terms US government public domain