Power assets and projects · USA · eia860m

Lake Creek / CT1

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)235.5 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-b5ced176b161eb16359791bf
Net Summer Capacity (MW)207 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-b5ced176b161eb16359791bf
Net Winter Capacity (MW)230 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-b5ced176b161eb16359791bf
Detailed source fields
Original source fieldPublished value or condition
Entity ID55983
Entity NameLuminant Generation Company LLC
Plant ID3502
Plant NameLake Creek
Google MapMap
Bing MapMap
Plant StateTX
CountyMcLennan
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDCT1
Nameplate Capacity (MW)235.5
Net Summer Capacity (MW)207
Net Winter Capacity (MW)230
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Latitude31.4647
Longitude-96.985
Original textCanceled or Postponed
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idCanceled or Postponed:53

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2195

Sources EV-68d64a1d31f0df590dcbc7cc
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1a3d544cc7fc995899177168cf4ee0b8db7717741c178b41c9d015ee402488cc

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:53

Sources EV-b5ced176b161eb16359791bf
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 9626fba520f5ddc40b3116831be178651544690543472b3f62f7f3989ba56fb6

Usage terms US government public domain

Source snapshots by date · USA · eia860

Lake Creek / CT1

Generator · Cancelled

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID55983
Utility NameLuminant Generation Company LLC
Plant Code3502
Plant NameLake Creek
StateTX
CountyMcLennan
Generator IDCT1
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)235.5
Summer Capacity (MW)207
Winter Capacity (MW)230
Uprate or Derate Completed During YearN
StatusCN
Synchronized to Transmission GridX
Sector NameIPP Non-CHP
Sector2
Energy Source 1NG
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textCN
source_record_id3_1_Generator_Y2025.xlsx#Retired and Canceled:2195

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2195

Sources EV-68d64a1d31f0df590dcbc7cc
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1a3d544cc7fc995899177168cf4ee0b8db7717741c178b41c9d015ee402488cc

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Lake Creek / CT1

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID55983
Entity NameLuminant Generation Company LLC
Plant ID3502
Plant NameLake Creek
Google MapMap
Bing MapMap
Plant StateTX
CountyMcLennan
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDCT1
Nameplate Capacity (MW)235.5
Net Summer Capacity (MW)207
Net Winter Capacity (MW)230
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Latitude31.4647
Longitude-96.985
Original textCanceled or Postponed
source_record_idCanceled or Postponed:53

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:53

Sources EV-b5ced176b161eb16359791bf
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 9626fba520f5ddc40b3116831be178651544690543472b3f62f7f3989ba56fb6

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel